Pregunta 1
05/23/2026 02:19pm - (22697) INTEGRATED CONSTRUCTION SERVICES, LLC.
Favor aclarar si se debe incluir en los seguros del proyecto la póliza de “Builder’s Risk”
Respuesta
Respuesta
06/12/2026 10:11am
Marjuli David Mateo (Oficial de Enlace)
The contractor must comply with section 3.7 of the Uniform General Conditions for Public Work Contracts in PR - Contract Work-Builders Risk Insurance.
Pregunta 2
05/23/2026 02:20pm - (22697) INTEGRATED CONSTRUCTION SERVICES, LLC.
El documento de planos en formato PDF titulado “26J-20990 MultifactoryBuildingProject.pdf” está en hojas de tamaño 17x11 y las mismas no están a escala. Favor de proveer este set de plano a escala.
Respuesta
Respuesta
06/12/2026 10:11am
Marjuli David Mateo (Oficial de Enlace)
REFER TO INDICATED DIMENSIONS ON THE DRAWINGS. DO NOT SCALE DRAWINGS AS PER NOTE #12 IN GENERAL NOTES AT DRAWING S-000.
Pregunta 3
05/23/2026 02:20pm - (22697) INTEGRATED CONSTRUCTION SERVICES, LLC.
Los planos del “Multifactory Building Project” le faltan las hojas S-4101, S-4102, y S-4103, favor proveer.
Respuesta
Respuesta
06/12/2026 10:13am
Marjuli David Mateo (Oficial de Enlace)
See provided documents (binder).
Pregunta 4
05/26/2026 11:21am - (22697) INTEGRATED CONSTRUCTION SERVICES, LLC.
¿Se ha realizado una prueba reciente de flujo de hidrante para la tubería de agua existente que sirve al proyecto? De ser así, favor proveer el informe de dicha prueba.
Respuesta
Respuesta
06/12/2026 10:13am
Marjuli David Mateo (Oficial de Enlace)
No. The construction plans and documentation were developed to work under current conditions.
Pregunta 5
05/26/2026 11:21am - (22697) INTEGRATED CONSTRUCTION SERVICES, LLC.
¿Qué presión estática, presión residual y caudal disponible deben utilizar los licitadores como base para el diseño y cotización del sistema de protección contra incendios?
Respuesta
Respuesta
06/12/2026 10:14am
Marjuli David Mateo (Oficial de Enlace)
The construction plans and documentation were developed to work under current conditions.
Pregunta 6
05/26/2026 11:22am - (22697) INTEGRATED CONSTRUCTION SERVICES, LLC.
¿Se ha confirmado que la tubería de AAA existente tiene capacidad suficiente para satisfacer la demanda requerida del sistema de protección contra incendios del proyecto?
Respuesta
Respuesta
06/12/2026 10:14am
Marjuli David Mateo (Oficial de Enlace)
The construction plans and documentation were developed to work under current conditions.
Pregunta 7
05/26/2026 11:23am - (22697) INTEGRATED CONSTRUCTION SERVICES, LLC.
Favor aclarar quién será responsable de obtener las aprobaciones de las autoridades de utilidades como AAA, LUMA, PRNET, para permisos de conexión/tapping, y cualquier aprobación o trabajo requerido relacionado con la conexión, modificación o mejoras a los sistemas de utilidades existentes.
Respuesta
Respuesta
06/12/2026 10:16am
Marjuli David Mateo (Oficial de Enlace)
PRASA, LUMA and PRNET endorsement were already approved and are in compliance. All works (contract documents) required for the completion of the project are under the contractor's responsibility.
Pregunta 8
05/26/2026 11:24am - (22697) INTEGRATED CONSTRUCTION SERVICES, LLC.
Si se determina que la tubería de agua existente no es adecuada para el sistema de fire protection, favor confirmar si las medidas correctivas requeridas — incluyendo, sin limitarse a, bomba contra incendios, tanque de almacenamiento de agua contra incendios, aumento en tamaño de la acometida, mejoras fuera del predio a la tubería principal de agua, u otras mejoras al sistema de la utilidad — serán atendidas por el Dueño mediante orden de cambio o como alcance separado.
Respuesta
Respuesta
06/12/2026 10:17am
Marjuli David Mateo (Oficial de Enlace)
THERE IS NO SPRINKLER SYSTEM DESIGN
Pregunta 9
05/27/2026 10:20am - (56229) Constructora Santiago III
Subject: Glazing Information for Hollow Metal Doors – Sheet A81-02
Reference: Sheet A81-02
Question / Description:
Sheet A81-02 indicates that Doors M106-1, M112-1, M118-1, and M124-1 are hollow metal doors with glazing included.
Please provide the glazing properties and specifications to be installed, including glass thickness and any other applicable requirements.
Respuesta
Respuesta
06/12/2026 10:17am
Marjuli David Mateo (Oficial de Enlace)
Refer to Spec 088000, Section 2.1 A. For Minimun Glass Thickness. Glazing type and color must be selected by Owner. Refer to Section 2.1 Products and 2.2 Glass for material specifications.
Pregunta 10
05/27/2026 10:21am - (56229) Constructora Santiago III
Subject: Missing Hardware Set Information – Sheet A81-02
Reference: Sheet A81-02
Question / Description:
Sheet A81-02 includes the hardware set number corresponding to each door. However, the contract documents received do not include the information or description corresponding to each hardware set.
Please provide the complete information for the hardware sets indicated in the drawings, including their respective components and specifications.
Respuesta
Respuesta
06/12/2026 10:17am
Marjuli David Mateo (Oficial de Enlace)
Refer to Spec 087111, Section 3.8 Door Hardware Schedule Sheet A81-02.
Hardware sets specified on Table: Door, Frame and Hardware Schedule - Multifactory. Column named: Hardware sets. 2, 3, 4 etc.
Pregunta 11
05/27/2026 10:21am - (56229) Constructora Santiago III
Subject: Builder’s Risk Insurance Requirement
Reference: Insurance Requirements
Question / Description:
The contract documents specify certain insurance coverages; however, Builder’s Risk insurance is not mentioned.
Please confirm whether a Builder’s Risk policy is required for this project and, if so, identify coverage limits and conditions.
Respuesta
Respuesta
06/12/2026 10:18am
Marjuli David Mateo (Oficial de Enlace)
The contractor must comply with section 3.7 of the Uniform General Conditions for Public Work Contracts in PR - Contract Work-Builders Risk Insurance.
Pregunta 12
05/27/2026 10:21am - (56229) Constructora Santiago III
Subject: Missing Model and Specifications for Overhead Roll-Up Doors M111-1, M117-1, M123-1, M129-1 – Sheet A81-02
Reference: Sheet A81-02
Question / Description:
Sheet A81-02 identifies doors M111-1, M117-1, M123-1, and M129-1 as overhead roll-up (OHC) doors. However, the drawings do not provide the model or detailed description for these doors, other than indicating that they shall be manual with the capability to accommodate a future motor installation.
Please provide the model, specifications, and any additional technical information for the OHC doors indicated in the drawings.
Respuesta
Respuesta
06/12/2026 10:21am
Marjuli David Mateo (Oficial de Enlace)
Refer to Spec 083230 section 2.6 Door Assembly.
Pregunta 13
05/27/2026 10:21am - (56229) Constructora Santiago III
Subject: Missing Louver Specifications and Models – Sheet A82-01
Reference: Sheet A82-01
Question / Description:
Sheet A82-01 includes details related to louvers W40 and W24. However, the drawings do not indicate the properties or model information for these louvers.
Please provide the required specifications and models for louvers W40 and W24.
Respuesta
Respuesta
06/12/2026 10:21am
Marjuli David Mateo (Oficial de Enlace)
Refer to Spec 085113, Section 2.1 for manufacturers and section 2.2 Windows Performance Requirements.
Pregunta 14
05/27/2026 10:22am - (56229) Constructora Santiago III
Subject: Missing Technical Specifications – 2" Siding Panel (Details 9/S-6002 & 11/S-6002)
Reference: Details 9/S-6002 and 11/S-6002
Question / Description:
Details 9/S-6002 and 11/S-6002 include a 2" siding panel. However, the contract documents do not provide technical specifications for this panel.
Please provide the full technical specifications for the 2" siding panel, including material, profile, fastening system, and any other applicable requirements.
Respuesta
Respuesta
06/12/2026 10:21am
Marjuli David Mateo (Oficial de Enlace)
Metal siding panel shall be Type R Gauge 24 pre-painted (color to be selected by owner). Refer to attached sketch for installation and fastening details (Sketch #0).
Pregunta 15
05/27/2026 10:22am - (56229) Constructora Santiago III
Subject: Tile Specification and Manufacturer – TL-1 Ceramic Tile 18" x 18" (Sheet A83-02)
Reference: Sheet A83-02
Question / Description:
Sheet A83-02 indicates that certain rooms will receive a ceramic tile floor finish (TL-1) 18" x 18". However, the contract documents do not include the technical specifications or manufacturer for this tile.
Please provide the full specifications for finish TL-1, including manufacturer, model, color, technical characteristics, and any other applicable requirements.
Respuesta
Respuesta
06/12/2026 10:21am
Marjuli David Mateo (Oficial de Enlace)
Refer to Spec 09320 Part 2 - Products 2.1 Ceramic Tile.
Pregunta 16
05/27/2026 10:22am - (56229) Constructora Santiago III
Subject: Roofing Waterproofing System Specifications – Sheets A60-02 & A60-03
Reference: Sheets A60-02 and A60-03
Question / Description:
Sheets A60-02 and A60-03 include components of the roof waterproofing system. However, the system name and technical specifications are not indicated in the contract documents.
Please provide the specified waterproofing system, including manufacturer, system type, composition, and any other applicable specifications needed.
Respuesta
Respuesta
06/12/2026 10:23am
Marjuli David Mateo (Oficial de Enlace)
Refer to Spec 075216. See section 1.4 Performance Requirements Tab D. and E.
Pregunta 17
05/27/2026 10:22am - (56229) Constructora Santiago III
Subject: Buy American / BABA Requirements
Reference: General Conditions and Bid Documents
Question / Description:
The contract documents do not indicate whether the project is funded in whole or in part with federal funds, nor if compliance with the Buy American Act or Build America, Buy America (BABA) is required.
Please confirm whether federal funding applies to this project and, if so, provide all applicable requirements and guidelines.
Respuesta
Respuesta
06/12/2026 10:23am
Marjuli David Mateo (Oficial de Enlace)
The project is funded with PRIDCO's own funds (state funds). Being a government agency, the 'Buy American Act' applies.
Pregunta 18
05/27/2026 10:22am - (56229) Constructora Santiago III
Subject: Applicable Wage Determination / Minimum Wage
Reference: General Conditions and Bid Documents
Question / Description:
The contract documents do not include any wage determination or minimum wage requirements.
Please provide the applicable minimum wage requirements for this project, including any Davis-Bacon or other prevailing wage rates that may apply, along with the corresponding wage determination, if required.
Respuesta
Respuesta
06/12/2026 10:27am
Marjuli David Mateo (Oficial de Enlace)
The Contractor shall comply with all applicable Federal and PR Commonwealth laws and regulations. Refer to Uniform General Conditions, Section 14.4.1 Labor Relations and Wages
Pregunta 19
05/27/2026 10:23am - (56229) Constructora Santiago III
Subject: LUMA Energy – Utility Connection and Impact Fees
Reference: General Conditions – Permits and Utilities
Question / Description:
The contract documents do not identify whether utility connection costs or impact fees from LUMA Energy are applicable.
Please confirm whether any electrical connection fees, system upgrades, or utility impact costs will be required.
If such costs are required but cannot be fully defined at this stage, please confirm whether the Owner will establish an allowance to cover these costs.
Respuesta
Respuesta
06/12/2026 10:27am
Marjuli David Mateo (Oficial de Enlace)
Allowance of $100,000.00 was added for (Owner's) LUMA connection related costs (LUMA connection, "Via Libre", improvements, etc.).
Pregunta 20
05/27/2026 10:23am - (56229) Constructora Santiago III
Subject: PRASA – Water and Sewer Connection Fees
Reference: General Conditions – Permits and Utilities
Question / Description:
Please confirm whether any water and/or sewer connection charges, system upgrades, or related infrastructure costs will be required.
If such costs are required but cannot be fully defined at this stage, please confirm whether the Owner will establish an allowance to cover these costs.
Respuesta
Respuesta
06/12/2026 10:28am
Marjuli David Mateo (Oficial de Enlace)
Allowance of $30,500.00 was added for PRASA connection and improvement fees.
Pregunta 21
05/27/2026 10:23am - (56229) Constructora Santiago III
Subject: SWPPP and CES Plan – Preparation and Inspection Responsibility
Reference: Environmental Requirements
Question / Description:
The contract documents require the preparation, implementation, and monthly maintenance of the SWPPP and CES Plan; however, they do not clearly define full responsibility for preparation and inspection.
Please confirm:
1. Who is responsible for preparing the SWPPP and CES Plan (Contractor or Owner).
2. Who is responsible for performing required inspections and ongoing compliance monitoring.
Respuesta
Respuesta
06/12/2026 10:28am
Marjuli David Mateo (Oficial de Enlace)
The designer is responsible for the application of the SWPPP and the CES permits as well as the inspections, however, the contractor site usage impacts compliance, therefore the contractor is key for compliance / monitoring.
Pregunta 22
05/27/2026 10:23am - (56229) Constructora Santiago III
Subject: Drainage System – Half Pipe
Reference: Sheets C-3000 & C-3001
Question / Description:
At Sections A & B of page C-3001, a Half Pipe is shown that is not indicated at plan C-3000. If the half pipe is required, please specify the diameter required.
Respuesta
Respuesta
06/12/2026 10:28am
Marjuli David Mateo (Oficial de Enlace)
There is no half pipe at the project, is only a earth swale to drain runoff to the catch basins. Consider the detail of earth swale attached with the document. Refer to document "Half Pipe - Earth Swale Clarification - C-3000, C-3001, C-3002.pdf"
Pregunta 23
05/27/2026 10:23am - (56229) Constructora Santiago III
Subject: Tile Specification and Manufacturer – TLB-1 Ceramic Wall Base Tile 6" x 18" (Sheet A83-02)
Reference: Sheet A83-02
Question / Description:
Sheet A83-02 indicates that certain rooms will receive a ceramic wall base tile finish (TLB-1) 6" x 18". However, the contract documents do not include the technical specifications or manufacturer for this tile.
Please provide the full specifications for finish TLB-1, including manufacturer, model, color, technical characteristics, and any other applicable requirements.
Respuesta
Respuesta
06/12/2026 10:28am
Marjuli David Mateo (Oficial de Enlace)
Refer to Spec 09320 Part 2 - Products 2.1 Ceramic Tile.
Pregunta 24
05/27/2026 10:24am - (56229) Constructora Santiago III
Subject: Missing Specification Divisions – Scope Clarification
Reference: Specification Manual – Divisions 01 through 33
Question / Description:
Several standard CSI specification divisions required for a complete building scope are not included in the contract documents, including:
• Division 04 – Masonry
• Division 05 – Metals
• Division 06 – Wood, Plastics, and Composites
• Division 07 – Thermal and Moisture Protection (roofing, waterproofing)
• Division 08 – Openings (doors, windows, louvers, glazing)
• Division 09 – Finishes
• Division 21 – Fire Protection
• Division 23 – HVAC Systems
• Division 27 – Communications
• Division 28 – Electronic Safety and Security
Please confirm:
1. Whether these divisions are intentionally excluded or will be issued by addendum.
2. That the bid shall be based strictly on the documents issued to date.
Respuesta
Respuesta
06/12/2026 10:29am
Marjuli David Mateo (Oficial de Enlace)
See inluded specs attached with this document (10. ADDITIONAL SPECS BIND).
Pregunta 25
05/27/2026 10:24am - (56229) Constructora Santiago III
Subject: Uniform General Conditions (Regulation No. 7998) – Request for Document
Reference: General Conditions, Item 29 – Regulation No. 7998
Question / Description:
Item 29 of the General Conditions requires that all bidders include in their proposal the provisions of Regulation No. 7998 dated March 3, 2011, titled “Uniform General Conditions for Public Work Contracts in Puerto Rico.”
However, said document has not been included as part of the contract documents provided.
Please provide the complete and official copy of Regulation No. 7998 / Uniform General Conditions applicable to this project.
Respuesta
Respuesta
06/12/2026 10:29am
Marjuli David Mateo (Oficial de Enlace)
Pregunta 26
05/27/2026 10:24am - (56229) Constructora Santiago III
Subject: Quantity Discrepancies – Supplementary Table Bid No. 26J-20990
Reference: BID SUMMARY FOR CIVIL & ELECTRICAL SITE IMPROVEMENTS & BID SUMMARY FOR NEW BUILDING CONSTRUCTION
Question / Description:
The BID SUMMARY FOR CIVIL & ELECTRICAL SITE IMPROVEMENTS & BID SUMMARY FOR NEW BUILDING CONSTRUCTION table indicates, for the majority of line items—except those identified as Lump Sum (LS)—a fixed quantity of “1” unit, regardless of the unit type (LF, CY, SF, EA, among others). This does not correspond to the actual quantities required for the project.
This condition is repeated throughout the various sections included in the document, which prevents proper quantity extensions and does not allow for the preparation of a proposal with accurately calculated quantities and totals for bidding purposes.
Please review and revise the indicated quantities so that they accurately reflect the actual project requirements in accordance with the drawings and specifications, if the intent is to provide such quantities as a basis for proposal preparation.
We recommend issuing a revised proposal form that includes the following:
• Breakdown in accordance with the 16 CSI divisions.
• Required unit prices, itemized per line item as applicable.
Respuesta
Respuesta
06/12/2026 10:29am
Marjuli David Mateo (Oficial de Enlace)
Prospect bidders will make their due diligence to estimate the project to it's full extent. Construction drawings as well as contractual obligations are to be accouted and incorporated into the supplied offer table ("Tabla de Ofertar"). This costs has to reflect the experience, core competency, means and methods and activity optimization. The variability of these perspectives will diferenciate the total proposal cost. The bidders will use the form structure to establish their costs and although some minor diferences are expected (rounding, measurement, etc.) the ammounts will fall in to an expected and reasonable ballpark. Bidders shall make their effort to establish the quantities and give their best cost to account for project completion bounded by the contruction documents. A new "tabla de ofertar" will be distributed. Make your best effor to use the available sctructure to include all the costs required for the project completion.
Pregunta 27
05/28/2026 10:58am - (22697) INTEGRATED CONSTRUCTION SERVICES, LLC.
Durante la visita al site notamos que las aceras existentes del perimetro del proyecto estan en condiciones muy deterioradas. Favor confirmar si se debe considerar la reconstruccion de estas aceras como parte del proyecto.
Respuesta
Respuesta
06/12/2026 10:30am
Marjuli David Mateo (Oficial de Enlace)
See drawing CD-1000 for site scope. Reconstruction of items out of the scope is not part of the project and should not be considered in the proposals. All contractual responsibilities (reconstruction of structures due to damaged as a result of construction activities) are contractual resposibilities.
Pregunta 28
05/28/2026 10:59am - (22697) INTEGRATED CONSTRUCTION SERVICES, LLC.
Durante la visita al site se pudo observar material de escombros apilados dentro del area de proyecto. Favor confirmar si la remocion y disposicion de estos escombros sera responsabilidad del Contratista
Respuesta
Respuesta
06/12/2026 10:30am
Marjuli David Mateo (Oficial de Enlace)
The contractor is responsible for the removal and disposition of all material on the site that may undermine the design intention, construction activities and intended use of the site. Please refer to drawing CD-1000. Take in to account that the regulated removal and disposition of regulated waste will be handled by "Allownce" in the case hazardous waste is found.
Pregunta 29
05/28/2026 11:04am - (22697) INTEGRATED CONSTRUCTION SERVICES, LLC.
Favor confirmar quien sera responsable de la poda de arboles y los permisos requeridos para la remocion de los arboles existentes.
Respuesta
Respuesta
06/12/2026 10:30am
Marjuli David Mateo (Oficial de Enlace)
The contractor is responsible for the cut and disposition of trees as established in contract documents (CD-1000, etc.).
Pregunta 30
05/28/2026 11:05am - (22697) INTEGRATED CONSTRUCTION SERVICES, LLC.
Favor aclarar la especificación aplicable para la tubería de agua potable soterrada. Los planos indican tubería de cobre Tipo L; sin embargo, favor confirmar si dicho material está aprobado para instalación soterrada/directamente enterrada en este proyecto. De no ser así, favor confirmar si la tubería de agua potable soterrada deberá ser cobre Tipo K, hierro dúctil, PVC AWWA, PE, u otro material requerido por las especificaciones, la AAA y/o los códigos aplicables.
Respuesta
Respuesta
06/12/2026 10:31am
Marjuli David Mateo (Oficial de Enlace)
The underground potable water pipe shall be Type K copper.
Pregunta 31
05/28/2026 11:31am - (22697) INTEGRATED CONSTRUCTION SERVICES, LLC.
Favor referirse a las hojas M00-00, M30-12, M30-40, M30-80. Segun indicado en estos planos, la especificacion para el material de la tuberia sanitaria del edificio es la "PV31 Polypropylene Pipe, Fire Resistant, Waste System". Favor confirmar si dicho material aplica a toda la tubería sanitaria del proyecto, o si se puede utilizar PVC Schedule 40.
Respuesta
Respuesta
06/12/2026 10:31am
Marjuli David Mateo (Oficial de Enlace)
PV-31 to be installed on indoor applications and PV-33 on outdoor aplications.
Pregunta 32
05/28/2026 11:56am - (22697) INTEGRATED CONSTRUCTION SERVICES, LLC.
En la hoja M20-12 y M20-80, la tubería de agua caliente no pide tener aislación. Favor confirmar si la tubería de agua caliente requiere aislación térmica. De ser requerida, favor confirmar el tipo de aislación, espesor, extensión aplicable y si debe cumplir con alguna especificación particular o requisito de código/eficiencia energética.
Respuesta
Respuesta
06/12/2026 10:32am
Marjuli David Mateo (Oficial de Enlace)
Refer to data sheet F4 for technical information, 1- 1/2" thickness.
Pregunta 33
06/01/2026 11:11am - (22697) INTEGRATED CONSTRUCTION SERVICES, LLC.
Favor confirmar la tasa de arbitrios de construcción aplicable a este proyecto para efectos de la preparación de la propuesta.
Respuesta
Respuesta
06/12/2026 10:32am
Marjuli David Mateo (Oficial de Enlace)
PRIDCO projects are exempt from the payment of municipal taxes ("arbitrios municipales"). See note 42 from the Special Conditions ( "VII. Condiiciones e Instrucciones Especiales"). This does not relieve the project from any other aplicable laws.
Pregunta 34
06/01/2026 11:13am - (22697) INTEGRATED CONSTRUCTION SERVICES, LLC.
Favor confirmar si este proyecto está sujeto a requisitos de contenido doméstico, incluyendo, pero sin limitarse a, las disposiciones de Buy America, Build America, Buy America Act (BABA), Buy American Act, o cualquier otro requisito federal o estatal relacionado con la adquisición y utilización de materiales, productos o equipos manufacturados en los Estados Unidos.
Respuesta
Respuesta
06/12/2026 10:32am
Marjuli David Mateo (Oficial de Enlace)
Being a government agency, the 'Buy American Act' applies.
Pregunta 35
06/01/2026 11:14am - (22697) INTEGRATED CONSTRUCTION SERVICES, LLC.
Favor confirmar la fuente de fondos aplicable a este proyecto.
Respuesta
Respuesta
06/12/2026 10:32am
Marjuli David Mateo (Oficial de Enlace)
State funds (Own of PRIDCO)
Pregunta 36
06/01/2026 12:37pm - (56652) TF Builders Group, LLC
En los documentos de licitación no se ha incluido el formulario correspondiente al ‘Bid Bond’. Favor de suministrarlo.
Respuesta
Respuesta
06/04/2026 11:05am
Orlando Collazo Rivera (Comprador)
El pliego de la subasta de referencia no establece un formulario específico o modelo prediseñado para la Fianza de Licitación (“Bid Bond”). No obstante, la misma deberá cumplir con lo establecido en el inciso 17 de la Sección III del pliego.
Pregunta 37
06/01/2026 12:39pm - (56652) TF Builders Group, LLC
En los documentos de licitación no se especifica la cuantía de los daños liquidos. Se solicita confirmar el monto correspondiente.
Respuesta
Respuesta
06/12/2026 10:34am
Marjuli David Mateo (Oficial de Enlace)
Refer to Section 9.5 of the Uniform General Conditions for Public Works Contracts in Puerto Rico - Liquidated Damages.
Pregunta 38
06/01/2026 05:09pm - (22697) INTEGRATED CONSTRUCTION SERVICES, LLC.
Hoja A81-02 en el schedule indica que la OHC es una overhead rollup con operacion manual pero con un motor futuro. Favor confirmar si las puertas de loading dock se deben considerar motorizadas o manuales.
Respuesta
Respuesta
06/12/2026 10:34am
Marjuli David Mateo (Oficial de Enlace)
The overhead rollup door are required to be manually operated. See Specification 083230 Overhead Coiling Doors Rev 1.
Pregunta 39
06/01/2026 05:11pm - (9163) DUNAMIS CONSTRUCTION CORP.
Nos podrían indicar de cuanto serán las cantidades de allowance a colocar en la tabla de ofertar de lo civil y eléctrico ?
Respuesta
Respuesta
06/12/2026 10:34am
Marjuli David Mateo (Oficial de Enlace)
As part of Addendum 2, additional Allowance will be established for PRASA connection and improvement fees for the ammount of $30,500.00. The Allowance for LUMA is in the ammount of $100,000.00 (for connnection and improvement works - Galvanized pole, "Via Libre", "Aportaciones", etc.)
Pregunta 40
06/02/2026 11:37am - (56652) TF Builders Group, LLC
Algunos de nuestros suplidores y subcontratistas han solicitado tiempo adicional para completar sus cotizaciones. Por tal razón, respetuosamente solicitamos una extensión en la fecha de entrega de la propuesta de al menos dos (2) semanas. Gracias
Respuesta
Respuesta
06/12/2026 10:34am
Marjuli David Mateo (Oficial de Enlace)
PRIDCO will request to the ASG a new bid opening date. It will be notified by addendum ("Enmienda").
Pregunta 41
06/02/2026 01:19pm - (56229) Constructora Santiago III
Subject: Incorrect Drawing Scales in Project Plans
Reference: Project Drawing Set
Question / Description:
As a general note, it has been observed that the drawings included in the project set do not reflect correct scales.
Please review and correct the corresponding sheets and provide updated drawings with accurate scales for estimating purposes.
Respuesta
Respuesta
06/12/2026 10:34am
Marjuli David Mateo (Oficial de Enlace)
REFER TO INDICATED DIMENSIONS ON THE DRAWINGS. DO NOT SCALE DRAWINGS AS PER NOTE #12 IN GENERAL NOTES AT DRAWING S-000.
Pregunta 42
06/02/2026 01:19pm - (56229) Constructora Santiago III
Subject: Sub-Base Thickness Missing
Reference: Sheet C-2000, Details 4 & 5
Question / Description:
There’s no sub-base thickness specified at details 4 & 5 in page C-2000. Please clarify.
Respuesta
Respuesta
06/12/2026 10:35am
Marjuli David Mateo (Oficial de Enlace)
SUB-BASE THICKCKESS IS REFERED TO THE EXISTING GRADE BELOW THE REQUIRED PAVEMENET SECTION OR IN CASE OF FILL AREAS USE SELECTED MATERIAL A-2-4 OR BETTER TO REACH THE DESIRED GRADES.
Pregunta 43
06/02/2026 01:19pm - (56229) Constructora Santiago III
Subject: Asphalt Pavement Details– Sheets C-1000 and C-2000
Reference: Sheet C-1000 and C-2000 Detail 4 & 5
Question / Description:
On page C-2000, two details were provided for asphalt pavement. There’s no limit shown for detail 5/C-2000 on page C-1000. Can we assume that all asphalt pavement areas will use that detail? Please clarify.
Respuesta
Respuesta
06/12/2026 10:35am
Marjuli David Mateo (Oficial de Enlace)
CONSIDER ALL PAVEMENT DRIVEWAY AREAS AS DETAIL 5, CONSIDER ONLY DETAIL 4 AT PAVEMENT PARKING SPACES ONLY.
Pregunta 44
06/02/2026 01:19pm - (56229) Constructora Santiago III
Subject: Concrete Pavement Different Details – Sheet C-2001, Details 2 & 5
Reference: Sheet C-2001, Details 2 & 5
Question / Description:
On page C-2001, there are two different typical sections provided for the construction of the concrete pavement. Please clarify which one applies.
Respuesta
Respuesta
06/12/2026 10:35am
Marjuli David Mateo (Oficial de Enlace)
DETAIL 2 IS THE REQUIRED SECTION OF CONCRETE PAVEMNET, DETAIL 5 IS FOR THE CONCRETE PAVEMENT JOINTS ALONG THE ENTIRE AREA. USE DETAIL 2 FOR THICKNESS AND REINFORCEMENT.
Pregunta 45
06/02/2026 01:19pm - (56229) Constructora Santiago III
Subject: Material Clarification for Angle L6x6x3/8 – Sheet S-3101, Detail 5
Reference: Sheet S-3101, Detail 5
Question / Description:
Sheet S-3101, Detail 5 indicates the installation of an L6x6x3/8 angle. However, the material specification for this angle is not indicated in the contract documents.
Please clarify the required material for the referenced angle.
Respuesta
Respuesta
06/12/2026 10:36am
Marjuli David Mateo (Oficial de Enlace)
REFER TO DRAWING S-000 , STRUCTURAL STEEL SECTION NOTES, NOTES NO. 1 THROUGH 9 INDICATES THE SPECIFIC TYPE OF STEEL TO BE USE FOR EACH STEEL SECTIONS.
Pregunta 46
06/02/2026 01:20pm - (56229) Constructora Santiago III
Subject: Missing Bond Beam Detail for CMU Walls – Sheet S-0000
Reference: Sheet S-0000
Question / Description:
Sheet S-0000 provides details for the construction of CMU walls. However, the detail related to tie beams is not included in the contract documents.
Please provide the required the tie beam detail.
Respuesta
Respuesta
06/12/2026 10:36am
Marjuli David Mateo (Oficial de Enlace)
REFER TO ATTACHED SKETCH SHOWING TIE BEAM DETAIL (SKETCH #3 - CMU WALL TIE BEAM DETAILS)
Pregunta 47
06/02/2026 01:20pm - (56229) Constructora Santiago III
Subject: Missing Concrete Strength Requirements – Roof Structural Slab & Slab Over Metal Deck
Reference: Sheet S-0000 – Concrete Note 4
Question / Description:
Sheet S-0000, under the Concrete Section, Note 4, does not specify the required compressive strength for the following structural elements:
• Roof Structural Slab
• Slab Over Metal Deck
Please provide the required concrete compressive strength for these structural elements, along with any associated mix design requirements.
Respuesta
Respuesta
06/12/2026 10:36am
Marjuli David Mateo (Oficial de Enlace)
CONCRETE COMPRESSIVE STRENGTH FOR ELEVATED SLABS SHALL ALSO BE 4,000 PSI. REFER TO CONCRETE NOTES WHICH ALSO APPLY TO THESE STRUCTRURAL ELEMENTS.
Pregunta 48
06/02/2026 01:20pm - (56229) Constructora Santiago III
Subject: Reinforcement Discrepancy – Electrical Roof Slab (Sheets S-6000 & S-2001)
Reference: Sheet S-6000, Detail F; Sheet S-2001
Question / Description:
Sheet S-6000, Detail F, shows the Electrical Roof slab with top and bottom double layers of reinforcement mats. The detail also indicates that the slab reinforcement shall be verified in the plan drawings.
However, Sheet S-2001 shows the slab reinforcement as a single layer of reinforcing bars each way.
Please clarify which reinforcement requirement shall prevail for the Electrical Roof slab.
Respuesta
Respuesta
06/12/2026 10:36am
Marjuli David Mateo (Oficial de Enlace)
REINFORCEMENT SHOWN ON PLAN ROOF PLAN DRAWING (S-2001) PREVAILS
Pregunta 49
06/02/2026 01:20pm - (56229) Constructora Santiago III
Subject: Joint Types vs Bid Item A6 (Miscellaneous)
Reference: Bid Form – Item A6 “Miscellaneous – Expansion Joints”; Contract Drawings
Question / Description:
Per the bid form under Item A6 – Miscellaneous, “Expansion Joints” are listed as an item.
However, based on the review of the contract drawings, only isolation joints, construction joints, and control joints have been identified. No expansion joints are clearly indicated.
Please clarify whether all joint types (including isolation, construction, and control joints) are intended to be included under this item, or if a revision to the bid form will be issued to properly define the scope.
Respuesta
Respuesta
06/12/2026 10:37am
Marjuli David Mateo (Oficial de Enlace)
FOLLOW THE PROVIDED DETAILS ON DRAWINGS. IF NOT DESPICTED AT DRAWING DOES NOT APPLY.
Pregunta 50
06/02/2026 01:21pm - (56229) Constructora Santiago III
Subject: Scope Clarification – Structural Steel (Bid Item S3)
Reference: Bid Form – Item S3 “Steel”; Contract Drawings
Question / Description:
Per the bid form under Item S3 – Steel, only structural steel elements such as framing, connections, and anchor bolts are listed.
However, no item is provided for miscellaneous steel components (including but not limited to supports, embeds, plates, angles, and other incidental steel elements that may be required per drawings).
Please clarify whether a separate bid item will be issued for miscellaneous steel, or where these elements are intended to be included within the current bid form structure.
Respuesta
Respuesta
06/12/2026 10:37am
Marjuli David Mateo (Oficial de Enlace)
FOLLOW THE PROVIDED DETAILS ON DRAWINGS . IF NOT DESPICTED AT DRAWING DOES NOT APPLY.
Pregunta 51
06/02/2026 01:21pm - (56229) Constructora Santiago III
Subject: Material Discrepancy – Sanitary Sewer Piping (Bid Item C5)
Reference: Bid Form – Item C5 “Sanitary Sewer System”; Contract Drawings
Question / Description:
Per the bid form under Item C5 – Sanitary Sewer System, the piping is identified as follows:
• 8" dia. concrete pipe
• 6" dia. concrete pipe
However, based on the review of the contract drawings, the sanitary sewer piping is shown as PVC.
Please clarify which material shall govern for sanitary sewer piping, and whether the bid form will be revised accordingly.
Respuesta
Respuesta
06/12/2026 10:37am
Marjuli David Mateo (Oficial de Enlace)
ALL PIPES ARE IN PVC UNLESS INDICATED AT DRAWINGS
Pregunta 52
06/02/2026 01:21pm - (56229) Constructora Santiago III
Subject: Scope Clarification – Landscaping / Tree Mitigation (Bid Item C7)
Reference: Bid Form – Item C7 “Land Scape – Tree Mitigation”; Contract Drawings
Question / Description:
Per the bid form under Item C7 – Landscape, “Tree Mitigation” is included as a lump sum item.
However, based on the review of the contract drawings, no clear scope, limits, quantities, or specific requirements for tree mitigation have been identified.
Please clarify the intended scope of work for Tree Mitigation, including whether additional documentation, details, or revisions will be issued to properly define this item.
Respuesta
Respuesta
06/12/2026 10:37am
Marjuli David Mateo (Oficial de Enlace)
CONTRACTOR SHALL CONSIDER ONLY THE CUT AND PROPPER DISPOSITION OF THE EXISTING TREES TO BE REMOVED AS PER CD-1000, SITE VISIT CONDITIONS AND RELATED CONTRACTUAL REQUIREMENTS.
Pregunta 53
06/02/2026 01:21pm - (56229) Constructora Santiago III
Subject: Scope Clarification – Landscaping / Tree Mitigation (Bid Item C7)
Reference: Bid Form – Item C7 “Land Scape – Tree Mitigation.
Question / Description:
Per the bid form under Item C7 – Landscape, “Tree Mitigation” is included as an item.
However, based on the review of the contract drawings, no landscape plan, planting layout, quantities, or specific requirements have been identified to define the scope of landscaping .
Please clarify if a landscape/planting plan will be issued to define the required scope, or provide guidance on the intended extent of work to be included under this item.
Respuesta
Respuesta
06/12/2026 10:38am
Marjuli David Mateo (Oficial de Enlace)
CONTRACTOR SHALL CONSIDER ONLY THE CUT AND PROPPER DISPOSITION OF THE EXISTING TREES TO BE REMOVED AS PER CD-1000, SITE VISIT CONDITIONS AND RELATED CONTRACTUAL REQUIREMENTS.
Pregunta 54
06/02/2026 01:24pm - (56229) Constructora Santiago III
Subject: Scope Clarification – Pavement Section (Bid Item C2)
Reference: Bid Form – Item C2 “General Site – Asphalt Pavement and Binder Course”.
Question / Description:
Per the bid form under Item C2 – General Site, only “2" Asphalt Pavement and Binder Course” is identified as part of the scope.
However, no separate items are included in the bid form for subbase or aggregate base course required for a complete pavement section.
Please clarify whether subbase and aggregate base materials are to be included under this item, or if a revised bid form will be issued including these components.
Respuesta
Respuesta
06/12/2026 10:38am
Marjuli David Mateo (Oficial de Enlace)
REFER TO QUESTIONS/ANSWERS 42 AND 43
Pregunta 55
06/02/2026 01:24pm - (56229) Constructora Santiago III
Subject: Scope Clarification – Trench Excavation (Bid Item C3 – Potable Water System)
Reference: Bid Form – Item C3 “Potable Water System”; Contract Drawings
Question / Description:
Per the bid form under Item C3 – Potable Water System, several components for piping and appurtenances are listed.
However, no separate item is provided for trench excavation required for the installation of the potable water piping system.
Please clarify whether trench excavation is to be included within the listed items, or if a revised bid form will be issued including this scope.
Respuesta
Respuesta
06/12/2026 10:38am
Marjuli David Mateo (Oficial de Enlace)
DETAILS FOR PIPE TRENCH ARE DESPICTED IN DRAWINGS.
Pregunta 56
06/02/2026 01:24pm - (56229) Constructora Santiago III
Subject: Scope Clarification – Trench Excavation (Bid Item C5 – Sanitary Sewer System)
Reference: Bid Form – Item C5 “Sanitary Sewer System”; Contract Drawings
Question / Description:
Per the bid form under Item C5 – Sanitary Sewer System, piping items are listed for the installation of the sanitary system.
However, no separate item is provided for trench excavation required for the installation of the sanitary sewer piping system.
Please clarify whether trench excavation is to be included within the listed items, or if a revised bid form will be issued including this scope.
Respuesta
Respuesta
06/12/2026 10:38am
Marjuli David Mateo (Oficial de Enlace)
DETAILS FOR PIPE TRENCH ARE DESPICTED IN DRAWINGS.
Pregunta 57
06/02/2026 01:25pm - (56229) Constructora Santiago III
Subject: Scope Clarification – Storm Sewer Piping (Bid Item C4)
Reference: Bid Form – Item C4 “Storm Sewer System”; Contract Drawings
Question / Description:
Per the bid form under Item C4 – Storm Sewer System, only 15" and 6" diameter piping are listed as part of the scope.
However, based on the review of the contract drawings, 12" and 8" diameter piping are also required for the storm sewer system.
Please clarify whether the 12" and 8" storm sewer piping are to be included within the existing bid items, or if a revised bid form will be issued including these items.
Respuesta
Respuesta
06/12/2026 10:39am
Marjuli David Mateo (Oficial de Enlace)
CORRECTED. THERE ARE 12" AND 8" PIPES IN THE STORM SEWER PLANS
Pregunta 58
06/02/2026 01:25pm - (56229) Constructora Santiago III
Subject: Scope Clarification – Utility Fees and Connections (Bid Item C8)
Reference: Bid Form – Item C8 “General”; Contract Drawings
Question / Description:
Per the bid form under Item C8 – General, the following items are listed:
• AAA Fee
• Tapping to Existing Water Lines
• Connection to Existing Sanitary Line
However, no information, basis of cost, or defined scope is provided in the contract documents to allow proper pricing of these items.
Please provide allowance values for these items or clarify if a revised bid form will be issued to properly define and quantify this scope.
Respuesta
Respuesta
06/12/2026 10:39am
Marjuli David Mateo (Oficial de Enlace)
IT WILL BE WORKED THROUGH ALLOWANCE.
Pregunta 59
06/02/2026 01:25pm - (56229) Constructora Santiago III
Subject: Scope Clarification – Hand Dryer (Bid Item A4 – Specialties)
Reference: Bid Form – Item A4 “Specialties”; Contract Drawings
Question / Description:
Per the bid form under Item A4 – Specialties, no item is included for hand dryers.
However, based on the review of the contract drawings, Xcelerator hand dryers are indicated in the plans.
Please clarify where the hand dryers are to be included within the bid form, or if a revised bid form will be issued including this item.
Respuesta
Respuesta
06/12/2026 10:39am
Marjuli David Mateo (Oficial de Enlace)
BID FORM WAS REVISED TO INCLUDE THE HAND DRYERS
Pregunta 60
06/02/2026 01:25pm - (56229) Constructora Santiago III
Subject: Scope Clarification – Fire Safing and Repairs (Bid Item A6 – Miscellaneous)
Reference: Bid Form – Item A6 “Miscellaneous”; Contract Drawings
Question / Description:
Per the bid form under Item A6 – Miscellaneous, “Wall Penetration, Fire Safing and Repairs” is included as a lump sum item.
However, no specifications, details, locations, or defined scope have been identified in the contract documents to establish the extent of these works.
Please provide specifications and scope definition for this item, or establish an allowance value to be carried under this item for bidding purposes.
Respuesta
Respuesta
06/12/2026 10:39am
Marjuli David Mateo (Oficial de Enlace)
THERE ARE SEVERAL WALL PENETRATIONS AT THE PROJECT SO SHALL BE CONSIDERED, REFER TO ELECTRICAL AND MECHANICAL DRAWINGS FOR SPECIFIC LOCATIONS AND ARCH. DRAWINGS FOR DETAILS.
Pregunta 61
06/02/2026 01:25pm - (56229) Constructora Santiago III
Subject: Scope Clarification – Concrete Stairs (Bid Item S2)
Reference: Bid Form – Item S2 “Concrete”; Contract Drawings
Question / Description:
Per the bid form under Item S2 – Concrete, several concrete elements are listed, including slab on grade, footings, walls, roof slab, beams, columns, and other structural components.
However, no separate item is provided for concrete stairs as shown in the contract drawings.
Please clarify whether concrete stairs are to be included within the listed items, or if a revised bid form will be issued including this scope.
Respuesta
Respuesta
06/12/2026 10:40am
Marjuli David Mateo (Oficial de Enlace)
CONCRETE STAIRS SHALL BE CONSIDERED.
Pregunta 62
06/02/2026 01:26pm - (56229) Constructora Santiago III
Subject: Scope Clarification – Wheel Stops (Bid Item C2 – General Site)
Reference: Bid Form – Item C2 “General Site”; Contract Drawings
Question / Description:
Per the bid form under Item C2 – General Site, no item is included for wheel stops.
However, based on the review of the contract drawings, wheel stops are indicated as part of the project scope.
Please clarify where wheel stops are to be included within the bid form, or if a revised bid form will be issued including this item.
Respuesta
Respuesta
06/12/2026 10:40am
Marjuli David Mateo (Oficial de Enlace)
WHEEL STOPS SHALL BE CONSIDERED
Pregunta 63
06/02/2026 01:26pm - (56229) Constructora Santiago III
Subject: Scope Clarification – Loading Dock Equipment and Rolling Doors
Reference: Specifications; Contract Drawings; Pre-Bid Discussions
Question / Description:
The specified and/or basis-of-design dock equipment included in the contract documents corresponds to premium-tier products, which significantly impacts cost competitiveness. Based on discussions with the design team, alternative equivalent equipment is being considered for bidding purposes.
Additionally, the contract documents specify rolling doors with FEMA requirements and manual operation. Based on industry standards and manufacturer limitations, doors of this size and wind-load rating (approximately 300 psf) cannot be operated manually due to weight and operational constraints. Typical manual operation is only feasible for significantly lower wind-load ratings (approximately 130 psf).
Please clarify:
• Whether equivalent alternatives to the specified dock equipment will be acceptable for bidding purposes.
• Whether the rolling door requirements (FEMA rating and manual operation) will be revised to reflect realistic and achievable configurations.
• Confirmation if revised drawings and specifications addressing these discrepancies will be issued as indicated during the pre-bid/site visit.
Respuesta
Respuesta
06/12/2026 10:40am
Marjuli David Mateo (Oficial de Enlace)
A REVISED ROOL UP DOOR SPECIFICATION WAS PROVIDED WITH A LOWER WIND VELOCITIES REQUIREMENTS. PLEASE PROVIDE BOTH OPTIONS AND THE HIGH WIND AS A SEPARATE ALTERNATE COST.
Pregunta 64
06/02/2026 01:26pm - (56229) Constructora Santiago III
Subject: Missing Mezzanine Floor Slab Reinforcement Details – Sheet S-1500
Reference: Sheet S-1500
Question / Description:
Sheet S-1500 does not include reinforcement details for the floor slabs at the mezzanine level.
Please provide the required reinforcement details and specifications for the mezzanine floor slabs.
Respuesta
Respuesta
06/12/2026 10:40am
Marjuli David Mateo (Oficial de Enlace)
NO MEZZANINE FLOOR AREA TO BE CONSIDERED AT THIS PHASE. THE BUILDING WAS DESIGN FOR A FUTURE MEZZANINE NOT PART OF THIS SCOPE.
Pregunta 65
06/02/2026 01:27pm - (56229) Constructora Santiago III
Subject: Air-Entrained vs. Non-Air-Entrained Concrete Mix Requirements
Reference: Concrete Specifications
Question / Description:
The concrete specifications include a Table I listing the required compressive strengths and recommended water/cement (w/c) ratios for the various concrete mixes. However, the specifications do not identify whether the mixes are required to be air-entrained or non-air-entrained.
Please clarify whether the specified concrete mixes shall be air-entrained or non-air-entrained and identify the applicable requirements for each mix type.
Respuesta
Respuesta
06/12/2026 10:41am
Marjuli David Mateo (Oficial de Enlace)
AIR ENTRAINED CONCRETE NOT APPLICABLE
Pregunta 66
06/02/2026 01:27pm - (56229) Constructora Santiago III
Subject: Bid Quantity Discrepancy – New Building Construction Summary
Reference: Bid Summary for New Building Construction; Contract Drawings
Question / Description:
The quantities provided in the Bid Summary for New Building Construction do not correlate with the quantities derived from the contract drawings and independent take-offs. Additionally, several scope elements identified in the drawings are not included within the bid summary table.
This discrepancy creates uncertainty and risk of omissions in the preparation of the proposal.
We recommend that the bid summary table be reviewed and corrected to align with the contract documents. Alternatively, please confirm if bidding should be based solely on division totals rather than individual line items to avoid potential errors or omissions.
Respuesta
Respuesta
06/12/2026 10:41am
Marjuli David Mateo (Oficial de Enlace)
See response to question #26.
Pregunta 67
06/02/2026 01:29pm - (56229) Constructora Santiago III
Subject: Request for Extension – Bid Proposal Submission Date
Reference: Bid Documents; Site Visit Coordination
Question / Description:
As of this date, clarifying addenda referenced during the site visit have not yet been issued. In addition, the time available for proper evaluation and incorporation of responses into the proposal is limited.
In order to ensure a complete and accurate proposal, we respectfully request that the bid submission deadline be extended by a minimum of two (2) weeks.
Respuesta
Respuesta
06/12/2026 10:41am
Marjuli David Mateo (Oficial de Enlace)
PRIDCO will request to the ASG a new bid opening date. It will be notified by addendum ("Enmienda").
Pregunta 68
06/03/2026 09:46am - (56652) TF Builders Group, LLC
En la hoja S-1001, en el área del “dock leveler” indica una diferencia de elevación de 18” mientras que en el detalle 3/S-3100 1’ 8”. Favor aclarar.
Respuesta
Respuesta
06/12/2026 10:41am
Marjuli David Mateo (Oficial de Enlace)
CORRECT DOCK LEVELER HEIGHT ELEVATION IS 1'-6" (18").
Pregunta 69
06/03/2026 09:46am - (56652) TF Builders Group, LLC
En las hojas S-1000, S-3100 y S-3101 indican que la elevación del fondo de las fundaciones es -3’6”. La sección 9 en la hoja S-3100 se puede ver que la elevación final del pavimento es -4’0”, por lo tanto, hay error en las elevaciones de las fundaciones. Esto afecta significativamente el computo de los hormigones de las paredes bajo nivel de piso. Favor indicar las “B.O.F.” correctas.
Respuesta
Respuesta
06/12/2026 10:42am
Marjuli David Mateo (Oficial de Enlace)
BOTTOM OF FOOOTING SHALL BE 3'-6" BELOW FINISHED ADJACENT GRADE AT PERIMETER FOUNDATIONS UNLESS OTHERWISE SPECIFIED IN SOILS STUDY. FOR INTERIOR FOOTINGS THE B.O.F. SHALL BE 3'-6" BELOW FINISHED FLOOR ELEVATION. REFER TO FOUNDATION DEPTH NOTES ON DRAWING S-3101
Pregunta 70
06/03/2026 09:47am - (56652) TF Builders Group, LLC
La sección 3 en la hoja S-3100 indica una diferencia de elevación entre “Finish Pavement Elev” y el piso del edificio de 7’ 4”. Contradice los 4’ que muestra la mayoría de los detalles, incluyendo las hojas de site. Favor aclarar.
Respuesta
Respuesta
06/12/2026 10:42am
Marjuli David Mateo (Oficial de Enlace)
CORRECT HEIGHT DIFFERENCE BETWEEN FINISHED FLOOR ELEVATION AND FINISHED PAVEMENT ELEVATION ON SECTION #3 SHALL BE 5'-8" TO ACCOUNT FOR LOADING DOCK AREA RAMP SLOPE
Pregunta 71
06/03/2026 02:14pm - (56652) TF Builders Group, LLC
Referente al detalle 7 de la hoja C-2001, ¿donde aplica el “Chain Link Fence”? En la hoja C-100 la verja de perímetro hace referencia al detalle 16/C-2000 que es un “Ornamental Gate”. En la hoja C-2002 aparentar que solo la entrada es ornamental y el perímetro es en otra clase de verja. Favor aclarar.
Respuesta
Respuesta
06/12/2026 10:42am
Marjuli David Mateo (Oficial de Enlace)
SEE ATTACHED C-1000 CLARIFICATION FENCE DRAWING
Pregunta 72
06/04/2026 11:37am - (12953) SUSTECH, LLC
Fondos y requisitos regulatorios - Favor confirmar la procedencia de los fondos asignados a este proyecto (federales, estatales o combinación de ambos) e identificar todas las disposiciones y requisitos aplicables, incluyendo, pero sin limitarse a, Davis-Bacon Act, Buy America Build America (BABA), Buy American Act (BAA), Trade Agreements Act (TAA), salario mínimo aplicable y cualquier otro requisito de cumplimiento relacionado con la contratación y adquisición de materiales.
Respuesta
Respuesta
06/12/2026 10:42am
Marjuli David Mateo (Oficial de Enlace)
The project is funded with PRIDCO's own funds (state funds). Being a government agency, the 'Buy American Act' applies.
Pregunta 73
06/04/2026 11:38am - (12953) SUSTECH, LLC
Modelos de urinales - El Plumbing Fixture Schedule hace referencia a dos modelos distintos para los urinales: Sloan WEUS-1000.1007 y American Standard Washbrook 6590.001.020. Favor confirmar cuál modelo debe utilizarse para propósitos de cotización y construcción.
Respuesta
Respuesta
06/12/2026 10:42am
Marjuli David Mateo (Oficial de Enlace)
THE CORRECT MODEL TO USE IS THE AMERICAN STANDARD WASHBROOK 6590.001.020.
Pregunta 74
06/04/2026 11:40am - (12953) SUSTECH, LLC
Terminaciones: Favor confirmar el alcance completo de pintura y acabados arquitectónicos para paneles prefabricados de concreto, acero estructural, joists, metal deck, conexiones expuestas y demás elementos estructurales. Indicar las superficies que deben recibir pintura, tipo de sistema requerido (shop primer, field touch-up, primer y acabado final, dry-fall, sellador, etc.), colores y niveles de acabado aplicables.
Respuesta
Respuesta
06/12/2026 10:43am
Marjuli David Mateo (Oficial de Enlace)
1. ALL INTERIOR STRUCTURAL STEEL AND STEEL JOISTS SHALL BE PRIMED UNLESS OTHERWISE INDICATED BY OWNER. 2. METAL SIDING SHALL BE GALVANIZED STEEL AND PRE-PAINTED FROM MANUFACTURER (COLOR TO BE SELECTED BY OWNER). 3. ROOF METAL DECK SHALL BE GALVANIZED STEEL. 4. REFER TO ARCHITECTURAL DRAWING A83-02 FOR WALL FINISH SCHEDULE. 5. REFER TO GENERAL NOTES 11 & 12 FOR EXTERIOR WALLS FINISH AND PAINTING. 6. FOR ADDITIONAL INFORMATION REFER TO STRUCTURAL STEEL NOTE #22, AND SPECIFICATIONS NO. 099000, 099113 AND 099123
Pregunta 75
06/04/2026 11:41am - (12953) SUSTECH, LLC
Water Heater - Favor proveer fabricante, modelo, capacidad, fuente de energía y especificaciones de desempeño del water heater requerido para el proyecto, o indicar el criterio de diseño a utilizar para su selección.
Respuesta
Respuesta
06/12/2026 10:43am
Marjuli David Mateo (Oficial de Enlace)
According to the construction plans, the water heater is not part of the contractor's scope. See sheet M20-12.
Pregunta 76
06/04/2026 11:43am - (12953) SUSTECH, LLC
Área de mezzanine - Favor confirmar si el área de mezzanine forma parte del alcance de este contrato. De ser afirmativo, favor proveer todos los detalles constructivos aplicables, incluyendo sistema estructural, acabados, metal siding, aislamiento, etc.
Respuesta
Respuesta
06/12/2026 10:43am
Marjuli David Mateo (Oficial de Enlace)
NO MEZZANINE FLOOR AREA TO BE CONSIDERED AT THIS PHASE. THE BUILDING WAS DESIGN FOR A FUTURE MEZZANINE NOT PART OF THIS SCOPE.
Pregunta 77
06/04/2026 11:43am - (12953) SUSTECH, LLC
Elevador - Favor confirmar si el suplido e instalación del elevador forman parte del alcance de este contrato. De ser afirmativo, favor proveer especificaciones técnicas, capacidad y detalles constructivos necesarios para su cotización.
Respuesta
Respuesta
06/12/2026 10:44am
Marjuli David Mateo (Oficial de Enlace)
Not In Contract. This is an option depending on tenant necesities. Refer to Sheet A13-02 which indicate "FUTURE AREA AND ELEVATOR"
Pregunta 78
06/04/2026 11:53am - (12953) SUSTECH, LLC
Altura de pared de cimentación (Stem Wall) - Según los planos estructurales, el fondo de cimentación (BOF) se indica a una elevación de 3'-6". Considerando un footing de 1'-6", una losa de 6" y el detalle de apoyo de la pared prefabricada, las dimensiones mostradas no parecen permitir la altura requerida para la pared de cimentación. Favor confirmar la altura de la pared de cimentación (stem wall) medida desde la parte superior del footing hasta el asiento de la pared prefabricada, o proveer las elevaciones correspondientes para aclarar la condición.
Respuesta
Respuesta
06/12/2026 10:44am
Marjuli David Mateo (Oficial de Enlace)
BOTTOM OF FOOOTING SHALL BE 3'-6" BELOW FINISHED ADJACENT GRADE AT PERIMETER FOUNDATIONS UNLESS OTHERWISE SPECIFIED IN SOILS STUDY. FOR INTERIOR FOOTINGS THE B.O.F. SHALL BE 3'-6" BELOW FINISHED FLOOR ELEVATION. REFER TO FOUNDATION DEPTH
Pregunta 79
06/04/2026 11:54am - (12953) SUSTECH, LLC
Durante la visita al sitio se observaron áreas cubiertas por vegetación densa que limitan la identificación y cuantificación de materiales existentes sobre el terreno, incluyendo posibles acumulaciones de escombros, desperdicios o material no clasificado. Para propósitos de licitación, favor considerar la inclusión de un allowance para la remoción y disposición de materiales superficiales no identificados en los documentos de licitación, o proveer una cantidad estimada que permita a todos los licitadores considerar el mismo alcance de trabajo.
Respuesta
Respuesta
06/12/2026 10:44am
Marjuli David Mateo (Oficial de Enlace)
The contractor is responsible for the removal and disposition of all material on the site that may undemine the design intention, construction activities and intended use of the site. Please refer to drawing CD-1000. Take in to account that the regulated removal and disposition of regulated waste will be handled by "Allownce" in the case hazardous waste is found.
Pregunta 80
06/04/2026 12:03pm - (12953) SUSTECH, LLC
Losa de hormigón existente y estructuras soterradas - Durante la visita al sitio se observó una losa de hormigón existente. Además, el Bid Form incluye una partida relacionada con su demolición/remoción; sin embargo, dicha losa no se encuentra claramente identificada en los planos ni se proveen detalles sobre su ubicación, dimensiones o espesor. Favor identificar la losa existente a la que hace referencia el Bid Form y proveer la información necesaria para cuantificar adecuadamente los trabajos de demolición, disposición y restauración requeridos.
Además, favor confirmar que no existen otras estructuras o elementos existentes dentro de los límites del proyecto que requieran demolición, remoción, relleno o disposición y que no hayan sido identificados en los documentos de licitación, incluyendo, pero sin limitarse a, zapatas, pedestales, losas, tanques soterrados, pozos, utilidades abandonadas o cualquier otra estructura enterrada.
Respuesta
Respuesta
06/12/2026 10:46am
Marjuli David Mateo (Oficial de Enlace)
The project site visit is required for all participants. The field conditions may impact means and method and they are subject to the contractors skills to perform the scope of work. Drawing CD-1000 contains the field conditions perceived by the attending participants.
Pregunta 81
06/04/2026 12:16pm - (12953) SUSTECH, LLC
Favor confirmar si existe algún permiso de corte de árboles, plan de mitigación ambiental o requerimiento de reforestación asociado al proyecto. De existir, favor proveer copia de los documentos aplicables para propósitos de estimación. De no existir, favor confirmar quién será responsable de obtener dichos permisos y cumplir con los requisitos de mitigación que puedan imponer las agencias con jurisdicción.
Respuesta
Respuesta
06/12/2026 10:47am
Marjuli David Mateo (Oficial de Enlace)
The designer is in charge of obtain the permit. The contractor is responsible for the cut and disposition of trees as established in contract documents (CD-1000, etc.).
Pregunta 82
06/04/2026 01:56pm - (56229) Constructora Santiago III
Subject: GENERAL SITE C2 – Fences
Reference: Sheets C-1000 & C-2000
Question / Description:
On page C-1000, the legend for the new perimeter fence indicates “New Chain Link Fence”, but the plan refers to detail 16/C-2000, which corresponds to an Ornamental Fence. Please clarify where each type of fence occurs.
Respuesta
Respuesta
06/12/2026 10:48am
Marjuli David Mateo (Oficial de Enlace)
SEE ATTACHED C-1000 CLARIFICATION FENCE DRAWING
Pregunta 83
06/04/2026 01:56pm - (56229) Constructora Santiago III
Subject: Missing Platform Support Details – Roof Ladder (Sheet A42-01)
Reference: Sheet A42-01
Question / Description:
Sheet A42-01 includes details for the roof ladder at the south side of the building. The detail references the structural drawings for additional information regarding the platform support.
However, the referenced platform support details are not included in the structural drawing set.
Please provide the required platform support details and any associated structural information necessary for installation.
Respuesta
Respuesta
06/12/2026 10:48am
Marjuli David Mateo (Oficial de Enlace)
REFER TO ATTACHED "VERTICAL LADDER WITH PLATFORM STRUCTURAL DETAIL" SKETCH
Pregunta 84
06/04/2026 01:56pm - (56229) Constructora Santiago III
Subject: Clarification of Maximum Slab-on-Ground Pour Area – Sheet S-0000
Reference: Sheet S-0000 – Concrete Notes, Note 13
Question / Description:
Sheet S-0000, under the Concrete Notes, Note 13, indicates that slab-on-ground placements shall not exceed 3,200 square feet per concrete pour.
Please clarify whether this limitation may be exceeded or if it should be considered as final requirement for estimating and bidding purposes.
Respuesta
Respuesta
06/12/2026 10:48am
Marjuli David Mateo (Oficial de Enlace)
MAXIMUM SLAB-ON-GRADE POUR SIZE IS 3,200 SQ. FT. UNLESS OTHERWISE APPROVED BY THE EOR. CONTRACTOR MAY SUBMIT A REQUEST FOR LARGER POUR SIZES ACCOMPANIED BY A CONCRETE PLACEMENT AND CRACK-CONTROL PLAN FOR EOR REVIEW AND APPROVAL.
Pregunta 85
06/04/2026 01:57pm - (56229) Constructora Santiago III
Subject: Clarification of Pavement Base Course Material – Details 4 & 5/C-2000
Reference: Details 4/C-2000 and 5/C-2000
Question / Description:
The typical pavement sections shown in Details 4/C-2000 and 5/C-2000 indicate a "4-inch Base Course" and a "6-inch Base Course," respectively.
However, the description does not clearly indicate whether the specified base course consists of asphalt base course or aggregate base material. In addition, the required mix type is not identified.
Please clarify whether the material required beneath the 2-inch Wearing Course is asphalt base course or aggregate base course, and provide the applicable material specifications and mix design requirements.
Respuesta
Respuesta
06/12/2026 10:49am
Marjuli David Mateo (Oficial de Enlace)
SUB-BASE THIKCKESS IS REFERED TO THE EXISTING GRADE BELOW THE REQUIRED PAVEMENET SECTION OR IN CASE OF FILL AREAS USE SELECTED MATERIAL A-2-4 OR BETTER TO REACH THE DESIRED GRADES
Pregunta 86
06/04/2026 01:57pm - (56229) Constructora Santiago III
Subject: Alternative Temporary Fence System – Sheet C-6000
Reference: Sheet C-6000
Question / Description:
Sheet C-6000 indicates a temporary fence around the perimeter of the site. The legend note specifies the use of a typical chain-link fence covered with black safety screening.
Please confirm whether alternative temporary fence systems may be used, provided they meet the project's safety, security, and screening requirements.
Respuesta
Respuesta
06/12/2026 10:49am
Marjuli David Mateo (Oficial de Enlace)
The intention is to install a temporary chain link fence around the perimeter covered with blacx safety screen. At the end of the proyect this shall be removed an a fnal fence as per design darwings shal be permanentky installed.
Pregunta 87
06/04/2026 01:57pm - (56229) Constructora Santiago III
Subject: Verification of Main Building Joint Layout for 6-Inch Slab – Sheet S-1001
Reference: Sheet S-1001
Question / Description:
Please verify that the joint layout shown on Sheet S-1001 is consistent with the designed slab thickness of 6 inches.
Confirm that the spacing and configuration of the contraction/control joints are appropriate for the specified slab thickness, or provide any required revisions.
Respuesta
Respuesta
06/12/2026 10:49am
Marjuli David Mateo (Oficial de Enlace)
PROVIDE ADDITIONAL INTERMEDIATE SAW CUT JOINTS (C.S.C.J.) AS SHOWN IN ATTACHED "ADDITIONAL SOG CONTROL JOINTS" SKETCH
Pregunta 88
06/04/2026 01:57pm - (56229) Constructora Santiago III
Subject: Applicable Municipal Construction Tax Rate – Municipality of Canóvanas
Reference: Municipality of Canóvanas requirements for construction excise taxes
Question / Description:
It is understood that the Municipality of Canóvanas establishes two different rates for the calculation of municipal construction excise taxes: 6% for projects without federal funding and 10% for projects with federal funding.
Please indicate whether the project is funded with federal funds and/or confirm the applicable rate to be used for the calculation of municipal construction excise taxes.
Respuesta
Respuesta
06/12/2026 10:49am
Marjuli David Mateo (Oficial de Enlace)
PRIDCO projects are exempt from the payment of municipal taxes ("arbitrios municipales") see note 42 from the Special Conditions ( "VII. Condiciones e Instrucciones Especiales"). This does not relieve the project from any other aplicable laws.
Pregunta 89
06/04/2026 03:26pm - (12953) SUSTECH, LLC
Verjas perímetro - Según la leyenda en la hoja de planos C-1000 las verjas de perímetro son "New Chainlink fence". En esta misma hoja se hace referencia al detalle 16 de la hoja C-2000. El este detalle corresponde a "Ornamental Gate Detail". Favor confirmar que detalle aplica para las verjas en el perímetro.
Respuesta
Respuesta
06/12/2026 10:49am
Marjuli David Mateo (Oficial de Enlace)
SEE ATTACHED C-1000 CLARIFICATION FENCE DRAWING
Pregunta 90
06/04/2026 03:53pm - (8674) GVG BUILDERS, INC.
Favor confirmar cuando el Dueno entregara el estudio de suelos al que hace referencia la nota 10 de la pagina S-0000
Respuesta
Respuesta
06/12/2026 10:50am
Marjuli David Mateo (Oficial de Enlace)
The Geotecnical Evaluation (26J-20990++326-5904Soil) was posted with the documentation of the original ASG Bid posting.
Pregunta 91
06/04/2026 03:54pm - (8674) GVG BUILDERS, INC.
Para la nota 22 del Structural Steel en la hoja S-00000 este sistema de pintura solicitado aplicara unicamente a los elementos de acero negro correcto? (no a los purlins, decking, etc.)
Respuesta
Respuesta
06/12/2026 10:50am
Marjuli David Mateo (Oficial de Enlace)
YES. REFER TO SPECIFICATION NO. 099000 FOR ADDITIONAL STEEL PAINT REQUIREMENTS
Pregunta 92
06/04/2026 03:54pm - (8674) GVG BUILDERS, INC.
Favor proveer tabla de detalles de los pedestales.
Respuesta
Respuesta
06/12/2026 10:50am
Marjuli David Mateo (Oficial de Enlace)
REFER TO DWG. S-6001 FOR PEDESTAL DETAILS
Pregunta 93
06/04/2026 03:54pm - (8674) GVG BUILDERS, INC.
La hoja S-1000 no tiene marcadas las secciones para poder saber donde aplica cada una.
Respuesta
Respuesta
06/12/2026 10:51am
Marjuli David Mateo (Oficial de Enlace)
CORRESPONDING SECTIONS ARE MARKED IN DRAWING S-1001
Pregunta 94
06/04/2026 03:54pm - (8674) GVG BUILDERS, INC.
Favor confirmar que el proyecto es lump sum
Respuesta
Respuesta
06/12/2026 10:51am
Marjuli David Mateo (Oficial de Enlace)
This is a "lump sum" (suma alzada) project in Puerto Rico. This refers to a fixed-price construction agreement where a contractor completes a defined scope of work for a predetermined, total fixed amount. Nevertheless, the contractor must submit a Breakdown For Payment with the pre-established item structure for payment purposes.
Pregunta 95
06/04/2026 03:54pm - (8674) GVG BUILDERS, INC.
Las pendientes de techo seran estructurales o con tapered insulation?
Respuesta
Respuesta
06/12/2026 10:51am
Marjuli David Mateo (Oficial de Enlace)
ROOF SHALL HAVE A STRUCTURAL SLOPE AS SHOWN IN FRAME ELEVATIONS ON DWG. S-4000. HOWEVER, CONTRACTOR SHALL REFER TO ARCHITECTURAL DRAWING A13-04R FOR FINAL ROOF SLOPE LAYOUT.
Pregunta 96
06/04/2026 03:54pm - (8674) GVG BUILDERS, INC.
Favor proveer detalles de la marca y modelo del elevador a utilizar como referencia.
Respuesta
Respuesta
06/12/2026 10:51am
Marjuli David Mateo (Oficial de Enlace)
NIC. This is an option depending on tenant necesities. Refer to Sheet A13-02 which indicate "FUTURE AREA AND ELEVATOR"
Pregunta 97
06/04/2026 03:55pm - (8674) GVG BUILDERS, INC.
En el detalle 4/A60-02 y otros detalles similares se muestra un parapeto en concreto y lo que apparenta ser un concrete deck entre el metal deck y la aislacion. Favor confirmar y proveer detalle estructural de esto.
Respuesta
Respuesta
06/12/2026 10:51am
Marjuli David Mateo (Oficial de Enlace)
REFER TO STRUCTURAL DRAWINGS
Pregunta 98
06/04/2026 03:55pm - (8674) GVG BUILDERS, INC.
Donde aplican los detalles 4, 5 y 6 / A70-01?
Respuesta
Respuesta
06/12/2026 10:52am
Marjuli David Mateo (Oficial de Enlace)
This are tipical details for the CMU walls against steel columns. Refer to drawing A13-02. As an example: the #4 is for columns along the axis 1 and 9, the #5 is for columns along the axis C, and #6 is for columns along the axis A and E.
Pregunta 99
06/04/2026 03:55pm - (8674) GVG BUILDERS, INC.
What is the item M129 Load/Unload en la 2/A41-01?
Respuesta
Respuesta
06/12/2026 10:52am
Marjuli David Mateo (Oficial de Enlace)
Pregunta 100
06/04/2026 03:55pm - (8674) GVG BUILDERS, INC.
What is the item M129 Load/Unload en la 2/A41-01?
Respuesta
Respuesta
06/12/2026 10:52am
Marjuli David Mateo (Oficial de Enlace)
Pregunta 101
06/04/2026 03:55pm - (8674) GVG BUILDERS, INC.
A que se reviere la nota de OVERCUT indicada en la C-3001?
Respuesta
Respuesta
06/12/2026 10:52am
Marjuli David Mateo (Oficial de Enlace)
As per soil report a minimun overcut of 12" is required. Remove existing soil and replaced with a selected material following site sections at drawing C-3001.
Pregunta 102
06/04/2026 03:55pm - (8674) GVG BUILDERS, INC.
Favor confirmar que el dueno estara pagando los costos de LUMA (via libre y otros). De no ser asi sugerimos se establezca un allowance para esto.
Respuesta
Respuesta
06/12/2026 10:52am
Marjuli David Mateo (Oficial de Enlace)
The Allowance included in Addendum 1 was for LUMA connnection and improvement works (Galvanized pole, "Via Libre", "Aportaciones", etc.) See Revised QuoteForm ("Tabla de Ofertar"), on the Allowances sub-section.
Pregunta 103
06/04/2026 03:56pm - (8674) GVG BUILDERS, INC.
Favor proveer detalle del roof lader mostrado en la 4/A20-02
Respuesta
Respuesta
06/12/2026 10:52am
Marjuli David Mateo (Oficial de Enlace)
Refer to details 9 to 14 on sheet A42-01
Pregunta 104
06/04/2026 03:56pm - (8674) GVG BUILDERS, INC.
Favor proveer detalle del C8 Girt en la K/S-6000 (espaciamiento, espesor, anclaje, etc.
Respuesta
Respuesta
06/12/2026 10:53am
Marjuli David Mateo (Oficial de Enlace)
SPACING SHALL BE EQUALLY SPACED NOT EXCEEDING 3'-0" O.C. (REFER TO FRAME ELEVATIONS ON DRAWINGS S-4000 AND S-4001). REFER TO DETAIL 9/S-6002 FOR ANCHORAGE DETAIL
Pregunta 105
06/04/2026 03:56pm - (8674) GVG BUILDERS, INC.
Favor proveer especificaciones/detalles del Metal siding deseado en la seccion K-S6000
Respuesta
Respuesta
06/12/2026 10:53am
Marjuli David Mateo (Oficial de Enlace)
METAL SIDING SHALL BE 24 GAUGE PREPAINTED V PANEL (TYPE D) HORIZONTALLY ORIENTED
Pregunta 106
06/04/2026 03:56pm - (8674) GVG BUILDERS, INC.
Cual es el porciento de arbitrios y patentes a contemplar por el contratista?
Respuesta
Respuesta
06/12/2026 10:54am
Marjuli David Mateo (Oficial de Enlace)
PRIDCO projects are exempt from the payment of municipal taxes ("arbitrios Municipales") see note 42 from the Special Conditions ( "VII. Condiiciones e Instrucciones Especiales"). This does not relieve the project from any other aplicable laws. It will be the contractor's responsibility to find out what is the percentage of the "patente municipal".
Pregunta 107
06/04/2026 03:56pm - (8674) GVG BUILDERS, INC.
Cuales seran las facilidades temporeras (oficina) requerida a ser suplido por el contratista, y que equipos/items han de incluirse?
Respuesta
Respuesta
06/12/2026 10:54am
Marjuli David Mateo (Oficial de Enlace)
See Special Conditions ("VII. Condiciones e Instruccciones Especiales") Note 44.
Pregunta 108
06/04/2026 03:56pm - (8674) GVG BUILDERS, INC.
Favor confirmar si se requerira un safety officer full time (cuyo unico trabajo sea safety) o si podra realizar otras tareas.
Respuesta
Respuesta
06/12/2026 10:54am
Marjuli David Mateo (Oficial de Enlace)
See Special Conditions ("VII. Condiciones e Instruccciones Especiales") Note 45 for minimum requirements. PRIDCO has no objection to the security officer performing other duties, as long as they meet the required minimum time.