Pregunta 1
03/19/2026 10:08am - Twenty Labs, LLC dba Healthy Together
1. Acceptance of Platform-Based Solutions Without Source Code Transfer:
Would PRWIC accept solutions delivered on a modern, proven platform where:
- PRWIC retains full ownership of its data, configurations, and outputs, and
- The underlying platform is licensed (not transferred), with no requirement to provide source code?
Respuesta
Respuesta
04/21/2026 07:07am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
PRWIC would accept a COTS/SAM/SaaS, custom development from scratch, or a hybrid approach where some modules are COTS-configured and others are custom-built models as long as the solution includes needs identified in attachment A & B to accomplish the PRWIC Modernization Goals described in Schedule VI, Section 4.
However, the proponent must comply with RFP Schedule VI:
Section 8.4. Close-out and Transition Procedures &
Section 8.4.1. Transferable Software Package
Pregunta 2
03/19/2026 10:09am - Twenty Labs, LLC dba Healthy Together
2. Interpretation of “Transferable Software Package”:
Can PRWIC clarify whether the “transferable software package” requirement may be satisfied through:
- Full data ownership and export capabilities,
- Complete system and configuration documentation, and
- Operational transition support to a successor vendor, without requiring transfer of platform source code?
Respuesta
Respuesta
04/22/2026 08:30am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
No, PRWIC requires transfer of platform source code.
Pregunta 3
03/19/2026 10:09am - Twenty Labs, LLC dba Healthy Together
3. Hosting and Platform Responsibility:
Would PRWIC consider contractor-managed AWS cloud hosting environments, where the contractor is responsible for:
- Platform maintenance, updates, and security compliance, and
- Ensuring alignment with evolving federal requirements (FReD, WUMEI, etc.), thereby reducing the need for PRWIC to manage or maintain underlying system code?
Respuesta
Respuesta
04/21/2026 07:08am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
Yes. However, PRWIC must be able to handle or maintain the source code after the Maintenance and Operations phase is complete.
Pregunta 4
03/19/2026 10:09am - Twenty Labs, LLC dba Healthy Together
4. Exceptions to Terms and Conditions:
What is the proper procedure for a contractor to formally take exception to any terms, conditions, or specifications contained in the RFP?
Respuesta
Respuesta
04/07/2026 08:57am
Orlando Collazo Rivera (Comprador)
The proper procedure for a contractor to formally take exception to any terms, conditions, or specifications contained in the RFP is established in Section 1.6 of Section 1 of the Bid Packet.
Pregunta 5
03/19/2026 03:27pm - (10220) GM Sectec, Corp
1. According to Page 8, Section 1.5 Timeline of the RFP, which presents the proposed timeline for the RFP process.
The timeline does not include the date of publication of the responses to requests for clarification for either the first or second round. Would PR WIC consider updating the timeline of the RFP to include response dates?
Respuesta
Respuesta
04/22/2026 08:07am
Orlando Collazo Rivera (Comprador)
Please refer to Amendment No. 2 for the referenced RFP.
Pregunta 6
03/19/2026 03:27pm - (10220) GM Sectec, Corp
2. According to Section 7 on page 52.
Given the accelerated timeline outlined in the Project Work Plan, can the Program confirm whether PRWIC subject matter experts (SMEs) and PRWIC project team members are expected to be dedicated full-time during the design and development phases? If not, what percentage of their time are SMEs expected to dedicate to support timely decision-making and validation activities?
Respuesta
Respuesta
04/11/2026 07:20pm
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
PRWIC understands the importance of SME’s participation along the project life. Being during the Initiation and Analysis and UAT phases the most critical active participation. During the design phase the SME’s participation will be to review designs presented and during development the SME’s roles are more to be available for clarifications.
The project Schedule will be reviewed, updated and approved at the beginning of the project and the SME’s participation assigned as needed in each phase.
However, PRWIC expectation is that the design should not be limited to SME’s idea of the functionalities but also enhanced and nurtured with the contractor vision and expertise. The PRWIC Program wants the Contractor to bring innovative options.
Pregunta 7
03/19/2026 03:28pm - (10220) GM Sectec, Corp
3. According to Section 8.1.1(D) on page 54.
Since Contractor has to create a Disaster Recovery plan and the system will reside within the OIAT Infrastructure:
a) Please confirm that the contractor will have full access to OIAT Resources.
b) Please confirm the scope of this responsibility: the contractor will develop the plan, who will be responsible for the testing and execution of the disaster Recovery Plan?
c) Where would the secondary site be implemented?
Respuesta
Respuesta
04/21/2026 08:11am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
a) The contractor will have the necessary access to OIAT resources.
b) The DRP will be developed by the contractor in collaboration with the necessary resources provided by OIAT and PRWIC. The contractor will be responsible for the testing and execution of the DRP in coordination with OIAT and PRWIC.
c)The secondary site may be on AWS and/or at an alternate physical site.
Pregunta 8
03/19/2026 03:28pm - (10220) GM Sectec, Corp
4. According to Section 8.1.1(D) on page 54.
Confirm if the external Platforms already comply with the security standards requested in the RFP?
Respuesta
Respuesta
04/22/2026 08:32am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
PRWIC requires the functionalities of the external platforms integrated into the new MIS.
Pregunta 9
03/19/2026 03:28pm - (10220) GM Sectec, Corp
5. In Attachment A (6. Section 15-Non-Functionals), according to Sections 3.15.3, 3.15.4 and 3.15.5 and their sub-items of the RFP, which require the system to perform within certain time criteria and support up to 10,000 concurrent users. Given that this system is required to run at OIAT and that the SLAs are dependent on the servers, resources, and network controlled by OIAT and not by the contractor: Would PRWIC reconsider these requirements as these resources will not be under the control of the contractor?
Respuesta
Respuesta
04/21/2026 08:41am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
It is important that the performance of a system is optimal. We know that outside of the system there are elements that can affect clinic-level performance that are beyond the contractor's control, such as network bandwidth. However, the performance of a system can be measured apart from external interference. For example:
1. Benchmarking Testing - Measure how many transactions per second a system processes without external interference.
2. Load testing - In the lab, network impact is eliminated to focus on CPU, memory, and internal logic.
3. Stress testing - Useful for identifying internal bottlenecks.
4. Capacity testing – Determines the maximum number of users or transactions that the system can support.
5. Internal response time testing (function execution time, local database access, internal processing)
6. Resource Usage Testing – Helps detect memory leaks or inefficient processes.
7. Profiling – Identifies which parts of the code are most time-consuming or resource-consuming.
Pregunta 10
03/19/2026 03:29pm - (10220) GM Sectec, Corp
6. In Attachment A (6. Section 15-Non-Functionals), according to Section 3.15.12.4 of the RFP, which requires the use of multi-factor security.
Which MFA method is planned for implementation, and are personal devices of users to be utilized?
Respuesta
Respuesta
04/22/2026 08:33am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
Currently, PRWIC is using Microsoft Authenticator through the FirstNet of each clinic.
Pregunta 11
03/19/2026 03:29pm - (10220) GM Sectec, Corp
7. In Attachment A (6. Section 15-Non-Functionals), according to Section 3.15.12.5 of the RFP.
a) How frequently will audits, vulnerability assessments, and penetration testing be conducted?
b) Will these services be the responsibility of OIAT or the contractor? If they are the contractor’s responsibility, will they be billed separately or included in the overall pricing?
Respuesta
Respuesta
04/22/2026 08:35am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
a) The vulnerability assessment must be carried out by the contractor at least four times a year and/or when significant changes are made, as well as the hardening of security in response to the vulnerabilities found. That should not entail additional costs but should be part of the maintenance cost. The Penetration test can be annual.
b) These services is responsibility of the Contractor and must be included in the Maintenance and Operations pricing.
Audits can be carried out by PRWIC on a regular basis. The above three processes can be reviewed by QA.
Pregunta 12
03/19/2026 03:29pm - (10220) GM Sectec, Corp
8. According to Section 5 on page 51.
To estimate cost, can the Program clarify whether the Warranty training is expected to be conducted in a single session for all clinics and Central Office, or in multiple sessions by location or user group?
Respuesta
Respuesta
04/11/2026 07:22pm
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
Section 5.2 PRWIC is expecting at least one additional training session for PRWIC staff at a time and modality to be determined.
Pregunta 13
03/19/2026 03:30pm - (10220) GM Sectec, Corp
9. According to Section 8.1.8 on pages 62–63.
If there are any corrections in the first versions of the manuals, can the subsequent corrected versions of manuals, be delivered digitally?
Respuesta
Respuesta
04/11/2026 07:22pm
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
PRWIC expects first and subsequent versions of the manuals to be delivered digitally.
Pregunta 14
03/19/2026 03:30pm - (10220) GM Sectec, Corp
10. According to Section 8.1.8 on pages 62–63.
a) Are the recordings required to be of the live in-person classes?
b) Would recordings of classes such as those provided through training software also be acceptable?
Respuesta
Respuesta
04/11/2026 08:05pm
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
Trainings must be face-to-face. Recordings are required for future education and should be provided through a platform accessible to the Program.
Pregunta 15
03/19/2026 03:31pm - (10220) GM Sectec, Corp
11. According to Section 8.1.8 on pages 62–63.
Considering the logistical complexity and cost implications for the project associated with in-person training such as: WIC staff travel and meals, repeated installation and dismantling of training environments at multiple venues across regions, procurement of sufficient laptops to allow concurrent installations for each next region’s training to occur, trainers and travel and lodging costs for staff for multiple concurrent training:
a) Would the Program consider alternative or hybrid training approaches that would reduce costs while allowing sufficient time for classes and practice?
b) Will laptops required for training sessions remain the property of the Contractor or be transferred to the Program?
c) If a training session includes 70 users (e.g., Ponce Region), since the accelerated proposed workplan does not seem to provide time for setup and teardown between sessions, and laptops for the next session must be prepared in advance, approximately 150 student laptops and their peripherals will be required, is this a proper estimate?
Respuesta
Respuesta
04/11/2026 07:24pm
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
Section 8.1.8 describes PRWIC requirements.
a) Face-to-Face Training.
b) The laptops or equipment purchase remain property of the contractor.
c) PRWIC understands that the timeline presented in the rollout phase is appropriate, including the readiness of the training sites. The calendar presented in this RFP provides for seven (7) trainings during the Rollout Phase.
Bidders are encouraged to present their best approach to satisfy these requirements considering the Bidder will take the lead on all the related tasks and costs.
Pregunta 16
03/19/2026 03:31pm - (10220) GM Sectec, Corp
12. According to Page 71 Item #2 - Staff Qualifications.
a) Since the system is to be developed, should the requirement be that Help Desk Staff should be experienced and knowledgeable in an existing WIC MIS?
b) How many points are designated for Help Desk staff qualifications?
Respuesta
Respuesta
04/14/2026 01:51pm
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
a) Help Desk Staff Qualifications in this section do not require an experienced and knowledgeable in a WIC MIS. It requires specific knowledge of the developed system, speaks spanish fluently, trained in customer service, general technical skills, and to handle expected call volume.
Specific evaluation points are assigned by the Evaluation Technical Committee.
Pregunta 17
03/19/2026 03:31pm - (10220) GM Sectec, Corp
13. According to Attachment A, Tab 2 – Enhancements of the WIC MIS Functional Requirements spreadsheet, which includes several requirements referencing functionality from the Vendor Selection and Food Selection subsystems developed by Contractor #2, and where some line items describe specific functionality (for example, line #158 for requirement 3.9.5.1 lists five requirements).
If any of these functionalities have already been developed in the external platforms and comply with the requirements, would there still be a need to redevelop this functionality, or can bidders assume that the requirement is to integrate the existing external subsystem with the new core MIS?
Respuesta
Respuesta
04/11/2026 07:25pm
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
PRWIC expectation is that the Contractor will redevelop the functionality as part of the new core MIS.
Pregunta 18
03/19/2026 03:31pm - (10220) GM Sectec, Corp
14. According to Attachment A, Tab 2 – Enhancements, Section 3.3.1.1 Maintain Food Category/Subcategory Table.
Please explain the purpose of this requirement and how PRWIC would intend this enhancement to work. The link between a UPC and a specific category is an integral part of WIC architecture because it is also used in WIC EBT to tie each transaction to a category so that the proper balance can be debited. For example, if a transaction comes in for a specific UPC that could belong to more than one category and the family food package has several of these categories, from what category bucket would the benefits be deducted?
Respuesta
Respuesta
04/21/2026 08:48am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
The issuance of benefits is made by family groups, and these should not present limitations either, allowing their redemption to be executed without inconvenience. This includes that, if two family members have the same food, they can be issued without the system imposing restrictions, as long as the Maximum Monthly Allowance (MMA) is met for each participant individually. In addition,for example, if the participant is assigned a package with low-fat cow's milk at 1% and without fat, they will be able to redeem it in different sizes and presentations, such as fresh, UHT, evaporated and powdered, without problems arising during its issuance and redemption. The same is expected for all food groups issued for all categories and subcategories of participants.
Pregunta 19
03/19/2026 03:32pm - (10220) GM Sectec, Corp
15. According to Attachment A, Tab 2 – Enhancements, Section 3.3.2.3 Determine Food Package Proration Schedule.
What food package proration methods are expected to be supported by the system? Can it be confirmed that only one proration method will be utilized at the same time?
Respuesta
Respuesta
04/11/2026 07:26pm
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
The Program will be implementing the Rolling method without proration.
Pregunta 20
03/19/2026 03:32pm - (10220) GM Sectec, Corp
16. According to Attachment A, Tab 2 – Enhancements, Section 3.3.4.1 Maintain UPC Database for WIC Authorized Foods.
Please define what is the expected level of integration for this subsystem. Is the automatic loading of a file containing the final selected foods and the corresponding information needed in the core MIS sufficient integration?
Respuesta
Respuesta
04/11/2026 07:27pm
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
The list of authorized foods is part of the food selection and evaluation process. It should be integrated into the functionality. The Food Selection and Evaluation process is described in Attachment 2, Table 5, item 3.14.4.
Pregunta 21
03/19/2026 03:32pm - (10220) GM Sectec, Corp
17. According to Attachment A, Tab 2 – Enhancements, Section 3.4.2.8 Process Changes to Electronic Benefits (Benefit Adjustments, Voids and Reissuance).
a) What type of alerts are PRWIC expecting?
b) Where should the alerts appear?
Respuesta
Respuesta
04/11/2026 07:28pm
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
PRWIC is expecting to have a system where alerts may be easy configurable.
Pregunta 22
03/19/2026 03:32pm - (10220) GM Sectec, Corp
18. According to Attachment A, Tab 2 – Enhancements, Section 3.4.3.1 PR Participants Reminders.
Would an automatic notification to the mobile device of all participants that have unredeemed benefits a given number of days (for example, five) before the end of the month be sufficient?
Respuesta
Respuesta
04/11/2026 07:28pm
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
PRWIC is expecting to send this alert though text, email and the mobile device.
Pregunta 23
03/19/2026 03:32pm - (10220) GM Sectec, Corp
19. According to Attachment A, Tab 2 – Enhancements, Section 3.5.3.1 Process Vendor Payment.
There are two separate business processes for Integrated Vendors and Stand-Beside Vendors, which require the Finance Department to request budget in separate transactions for one effective payment date. EBT and MIS provide reconciliation and vendor reports that are used for reconciliation, and the Finance Department wants to enhance or automate this process and produce the reconciliation report. Please provide a description of the expected reconciliation process, including the sources of transactions that must be considered in the reconciliation report.
Respuesta
Respuesta
04/11/2026 07:29pm
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
PR WIC requires an automated system report with the following descriptions: Year, Account Date, Settlement Date, Account Internal (Standard Besides), Account Financial, Account Internal & Financial, Account External, EBT Total, Vendor Debt Transaction, and Total Paid. The report must provide parameter options to generate it daily, monthly, and annually.
Pregunta 24
03/19/2026 03:33pm - (10220) GM Sectec, Corp
20. According to Attachment A, Tab 2 – Enhancements, Section 3.5.3.2 PR Adjustments.
Please confirm if a process such as the following is what PRWIC expects for this requirement:
• A set of dates is provided by PRWIC for analysis.
• A UPC (or several) is identified by PRWIC, and the proper payment amount is indicated by peer group for each UPC selected.
• The system reviews all redemptions during the period that includes the indicated UPC(s) and calculates the net adjustment for each vendor.
• A special ACH is prepared with the corresponding payments to vendors.
Respuesta
Respuesta
04/11/2026 07:30pm
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
These processes described and the description included in the RFP Attachment A, Tab 2, Section 3.5.3.2 will be discussed in more detail during the Analysis and Design Phase.
Pregunta 25
03/19/2026 03:33pm - (10220) GM Sectec, Corp
21. According to Attachment A, Tab 2 – Enhancements, Section 3.5.4.2 Retrieve Transaction History Data / Reconcile Redeemed, Adjusted, Voided, and Expired Benefits with Issuance File. The current reports need to be reviewed and adapted to the program’s needs and must show benefits redeemed and not redeemed. Can you please provide a copy of the current report with an indication of the changes required so that our estimate can be calculated?
Respuesta
Respuesta
04/11/2026 07:30pm
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
PR WIC requires an automated report by the system that has the following descriptions; Benefit Category, Benefit Subcategory, Benefit Quantity Issued, Settlement Amount, Quantity Redeemed, Quantity Not Redeemed, Benefit Void and Percent Redeemed. The report must provide parameter options to generate it daily, monthly, and annually.
Pregunta 26
03/19/2026 03:33pm - (10220) GM Sectec, Corp
22. According to Attachment A, Tab 2 – Enhancements, Section 3.6.1.1 Track Grants, Section 3.6.2.2 Monitor Food Expenditures, Section 3.6.2.3 Perform Financial Modeling, Section 3.6.2.4 Manage Cash Flow, Section 3.6.3.3 Monitor Rebate Collections, Enhancements, Section 3.7.3.1 Track Actual Participation, Section 3.8.2.2 Track Outreach Campaign Activities.
Can you please provide a detailed description of what is expected by the requiring area so an estimate of the time and cost can be developed?
Respuesta
Respuesta
04/11/2026 07:31pm
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
PR WIC requires an Excel spreadsheet program that records the annual food grant allowance and allows for monthly estimates of expenses, rebates, and participation throughout the year. It must also provide functionality to input actual expenses, rebates, and participation as the months progress. Additionally, it must be able to adjust the food inflation rate and provide columns to determine costs per participant. This program must be editable monthly.
Also, Additional information for FReD requirements can be found at the FNS website:
https://fns-prod.azureedge.us/sites/default/files/FReD-v2.0-Final.pdf
Pregunta 27
03/19/2026 03:33pm - (10220) GM Sectec, Corp
23. According to Attachment A, Tab 5 – External Platforms of the RFP.
a) Can PRWIC confirm whether the external platforms referenced in this RFP are considered complete and operational as currently implemented, or whether additional enhancements to those platforms are expected as part of this project?
b) Confirm that the development of new functionality within those external platforms is outside the scope of the MIS contractor unless specifically identified through the Change Request process?
Respuesta
Respuesta
04/11/2026 07:32pm
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
Keeping the current external platforms is not an option. PRWIC expectation is that these functionalities be integrated into the new MIS system. (Re-developed).
Bidders must keep in mind PRWIC goals described in Schedule VI, Section 4.
Pregunta 28
03/19/2026 03:34pm - (10220) GM Sectec, Corp
24. According to Section 1.4 Delivery Term and Warranty states that: During the evaluation to award points, the shortest delivery term and the most extensive warranty shall receive the highest score available for said criteria.
The development of a new PRWIC MIS must comply with all the functionality in use in the current system plus the required functionalities not currently in use, in addition to the integration of the new platforms and enhancements. This scope is broader than that of previous transfer projects, in which only the non-compliant parts were developed. Consequently, the accelerated timeline proposed in the RFP combined with the assignment of the highest possible score for the shortest delivery term could potentially result in unrealistic proposals at a lower cost, which would eventually need to be compensated through change orders, which would increase the actual cost of the project.
Will PR WIC consider eliminating the extra credit for a shorter delivery term, given the potential negative effect on the outcome of the project?
Respuesta
Respuesta
04/22/2026 09:16am
Orlando Collazo Rivera (Comprador)
The shortest delivery term will not be considered a determining factor, nor will it receive additional scoring within the evaluation process. Notwithstanding Section 4.1.4 (Delivery Term and Warranty) of the RFP, delivery term and warranty will not be evaluated as scoring criteria for this procurement. The evaluation of proposals will be conducted in accordance with the evaluation criteria established by the requesting agency, as defined in this RFP.
Pregunta 29
03/19/2026 03:34pm - (10220) GM Sectec, Corp
25. According to Attachment A, Tab 5 – External Platforms of the RFP.
The RFP references integration with multiple external platforms; however, a specific cost component for these integrations does not appear to be identified.
To support accurate estimation and proposal comparison, can PRWIC consider including a separate line item for platform integration included in Attachment A section 5, in section F of the Price schedule for platform integrations in the cost proposal?
Respuesta
Respuesta
04/14/2026 01:56pm
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
Bidders will be alowed to separate the cost for the platforms integration as a new line item in the Cost Proposal (Attachment C) as follows:
F1-All Requirements (Attachment A, Tabs 1-4 & 6 and Attachment B)
F2-WIC Direct Interface Complete
F3-Secure Software Development Certification
F4-Requirements in Attachment A, Tab 5-External Platforms
Pregunta 30
03/19/2026 03:34pm - (10220) GM Sectec, Corp
26. Since the definition of “integration” can be extremely broad and no documentation has been provided for the 15 platforms expected to be integrated, Will PR WIC provide full documentation as part of the response to the clarification request? Will PR WIC provide documentation describing data flows, data stores, data layouts and other pertinent information to allow bidders to determine the appropriate approach and cost for integrating each platform with the core MIS system in terms of functionality, data storage, reporting, and other services?
Respuesta
Respuesta
04/11/2026 07:33pm
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
Please refer to question #27.
Pregunta 31
03/19/2026 03:35pm - (10220) GM Sectec, Corp
27. According to the integration requirements referenced in the RFP.
A definition frequently used in U.S. federal and state procurements is:
“System integration is the process of connecting two or more information systems so that they interoperate and exchange data electronically in a secure, reliable, and automated manner, enabling coordinated functionality and eliminating the need for manual data entry or reconciliation.” This definition does not require that the screens or processes in either system be rewritten or modified to look similar. It requires the exchange of information without manual intervention and the proper mapping of data from one system to another. Is this definition acceptable for the purposes of this RFP?
Respuesta
Respuesta
04/11/2026 07:33pm
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
Please refer to question #27.
Pregunta 32
03/19/2026 03:35pm - (10220) GM Sectec, Corp
28. According to the Project Schedule referenced in the RFP, pg. 76. shows 10 days for the rollout for each Region from 2 to 7 and 20 days for Region 1.and Section 8.1.8 on page 62, clinics staff training may take between 1-2 weeks to ensure enough time to present the topics and provide for practice time “and the Project Schedule Sample on page 76:
a) Considering that training will be conducted across multiple regions and will require the setup and relocation of equipment and training environments between locations, can the Department clarify whether the sample project work schedule accounts for the time required to set up and dismantle training facilities between regions?
b) Or is the expectation that the two (2) whole weeks be utilized for training and practice at the training venue?
Respuesta
Respuesta
04/11/2026 07:34pm
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
PRWIC understands that the timeline presented in the rollout phase is appropriate, including the readiness of the training sites. The calendar presented in this RFP provides for seven (7) trainings during the Rollout Phase.
PRWIC expectation is that the training will be one (1) week at the venue and one (1) week back at the clinics for practice.
Pregunta 33
03/19/2026 03:40pm - (10220) GM Sectec, Corp
29. According to Section 5.3 Delivery, pg.22
This section refers to penalties for late delivery under Puerto Rico procurement regulations and includes provisions applicable to construction projects. Given that this project will be funded with federal funds, please clarify what delay penalties or contractual remedies will apply in the event of late delivery of services.
Respuesta
Respuesta
04/22/2026 09:27am
Orlando Collazo Rivera (Comprador)
This RFP is fully or partially funded with federal funds; therefore, the applicable provisions shall be those established under the corresponding federal regulations, as indicated in Section 5.3 of the Bid Solicitation.
Accordingly, any contractual remedy or measure for breach or late delivery of services shall be governed by the applicable federal requirements and by the terms and conditions of the resulting contract, as applicable to the nature of the project.
Pregunta 34
03/19/2026 03:42pm - (10220) GM Sectec, Corp
30. According to Project Schedule Sample pg. 76.
The Work Plan allocates approximately 130 days for Analysis and Design and 128 days for Development. The development of WIC MIS systems in other jurisdictions has historically required significantly longer implementation timelines, and the existing platforms that we need to integrate have been under development since approximately 2020.
The development of a new PRWIC MIS must comply with all the functionality in use in the current system plus the required functionalities not currently in use, in addition to the integration of the new platforms and enhancements. Although this scope is much greater than the scope of previous transfer projects where only the non- complying parts were developed, the current project timeline is shorter than the previous system transfers PRWIC has procured.
Considering the scope and complexity of implementing a new MIS System capable of supporting the full program operations and FReD requirements, can the Program clarify the assumptions used to establish these timelines and whether the proposed implementation timeline is based on prior experience with comparable large-scale WIC MIS system development efforts, as opposed to transfer and implementation models, which are more commonly associated with 24-month implementation timelines?
Respuesta
Respuesta
04/21/2026 08:59am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
The RFP work plan included in Schedule VI, Section 9, is presented as a sample. Bidders are encouraged to present their proposal based in the 24 months for the Development and Implementation Phase.
However, the internal activities and tasks within the project work plan may vary. For example, we can allow the Analysis and Design phase to start earlier, after the kickoff meeting, to have more time for this phase or to the Development phase.
An estimate of time per phases could be similar to the following:
Planning - 1 month
Analysis and Design - 6 months
Development - 7 months
UAT - 2 months
Pilot - 3 months
Rollout - 4 months
Closing - 1 month
Pregunta 35
03/19/2026 03:43pm - (10220) GM Sectec, Corp
31. According to Project Schedule Sample pg. 76.
The Work Plan allocates approximately 130 days for Analysis and Design and 128 days for Development. The development of WIC MIS systems in other jurisdictions has historically required significantly longer implementation timelines, and the existing platforms that we need to integrate have been under development since approximately 2020.
The development of a new PRWIC MIS must comply with all the functionality in use in the current system plus the required functionalities not currently in use, in addition to the integration of the new platforms and enhancements. Although this scope is much greater than the scope of previous transfer projects where only the non- complying parts were developed, the current project timeline is shorter than the previous system transfers PRWIC has procured.
Will WIC consider allowing more time in the work plan, in proportion to the effort required for development of a new system vs customizing a transfer system, without penalty for a reasonably longer delivery term?
Respuesta
Respuesta
04/21/2026 09:01am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
Please refer to Question #34.
Pregunta 36
03/19/2026 03:43pm - (10220) GM Sectec, Corp
32. According to Section 9, pq.74, it suggests running Data Migration in parallel with Analysis and Design. Please clarify how PR WIC suggests running Data Migration in parallel with Analysis and Design.
Respuesta
Respuesta
04/11/2026 07:36pm
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
The Data Migration Activity includes Data Migration Data Analysis, Data Cleanup, Develop and test Conversion Programs. The activity should start concurrently with the MIS system Analysis and Design phase (early in the project).
Pregunta 37
03/19/2026 03:43pm - (10220) GM Sectec, Corp
33. According to the Project Work Plan referenced in the RFP.
Since activities to integrate external platforms can significantly affect the project scope, schedule, and level of effort, can the Program clarify how platform integration activities are expected to be addressed in the Work Plan?
Respuesta
Respuesta
04/11/2026 07:39pm
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
The integration of the external platforms should be treated as any other functionality within the developed system and will have their section under each phase of the SDLC work plan.
Pregunta 38
03/19/2026 03:44pm - (10220) GM Sectec, Corp
34. According to Table 2: Evaluation Criteria pg.18, Technical Proposal Item #3
Please share the evaluation criteria for the Technical Proposal (550 points)
Respuesta
Respuesta
04/11/2026 07:39pm
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
Evaluation criteria and points were included in Section 4, Table 2. The Evaluation points distribution will be assigned by the Technical Evaluation Committee.
Pregunta 39
03/19/2026 03:44pm - (10220) GM Sectec, Corp
35. According to Page 20, Section 4.1.4 Delivery Term and Warranty.
How are points assigned to proposals with delivery terms longer than the shortest proposed delivery term? For example, if the points for the delivery term criteria were 100 points and the shortest bid delivery term is 18 months and receives the full 100 points, how many points would be assigned to the second, third, and fourth shortest delivery terms? Is there a formula or a fixed value table used to assign the points for delivery term and warranty proposals?
Respuesta
Respuesta
04/22/2026 09:32am
Orlando Collazo Rivera (Comprador)
The RFP work plan included in Schedule VI, Section 9, is presented as a sample. However, Bidders are encouraged to present their proposal based in the 24 months for the Development and Implementation Phase. The Evaluation points distribution will be assigned by the Technical Evaluation Committee.
Pregunta 40
03/19/2026 03:44pm - (10220) GM Sectec, Corp
36. According to Page 41, Schedule V – Staffing Proposal, Additional Staff
Are the roles listed in this section considered mandatory roles or additional staff that bidders are encouraged to include?
Respuesta
Respuesta
04/14/2026 01:57pm
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
Staff proposed includes all the staff for accomplishing all phases of the contract, including the key staff. PRWIC is expecting an organization chart, with roles and responsibilities and resumes and narratives of their unique qualifications. Additional staff is optional, but bidders are encouraged to include their resumes and narrative, if desired.
Pregunta 41
03/19/2026 03:44pm - (10220) GM Sectec, Corp
37. According to page 79, under section 10, Bidder staffing. During the Development and Implementation phase the Contractor's key staff are expected to be full-time dedicated to work primarily on-site, as required by PRWIC. It is expected that additional Contractor staff will work on-site while performing major tasks. Please clarify if on-site means in PRWIC offices and if the requirement is during the entire phase or for specific events during those phases, as required by PRWIC. tasks (e.g. design confirmation; acceptance testing; training; pilot etc.), as needed.
Respuesta
Respuesta
04/21/2026 09:07am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
Onsite means the Project Office in Puerto Rico or in PRWIC offices as needed by the state agency during Development & Implementation, warranty and Maintenance & Operations phases.
Please refer to Schedule VI, Section 10.
Pregunta 42
03/19/2026 03:44pm - (10220) GM Sectec, Corp
38. According to page 79, under section 10, Bidder staffing: During the Warranty and Maintenance and Operations phases It is expected that at least one Developer will be dedicated to work on-site during this period.
a) Please clarify if on-site means in PRWIC offices for specific events during those phases, as required by PRWIC or during the complete phase?
b) Will it be acceptable for a Senior Analyst to also be present to provide proper documentation to be approved by PRWIC as agreed to by both parties?
Respuesta
Respuesta
04/21/2026 09:08am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
a) Please refer to Question #41.
b) Yes.
Pregunta 43
03/19/2026 03:45pm - (10220) GM Sectec, Corp
39. According to Section 8.1.7 on page 61, Secure Software Testing.
Please clarify the scope of testing responsibilities assigned to the Contractor.
Respuesta
Respuesta
04/22/2026 08:37am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
Please refer to question #11.
Pregunta 44
03/19/2026 03:45pm - (10220) GM Sectec, Corp
40. According to Section 8.1.12 on page 65.
a) Please confirm expectations regarding deployment support during rollout.
b) Will the Contractor be required to provide onsite technical support during the initial implementation phase?
c) If that is expected, what duration should this support be for each clinic?
Respuesta
Respuesta
04/21/2026 09:10am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
Section 8.1.12 details the contractor support during this phase. Also, Section 10, page 79 states the following:
It is understood that staffing levels will vary across the project phases:
• During the Development and Implementation phase the Contractor’s key staff are expected to be full-time dedicated to work primarily on-site, as required by PRWIC. It is expected that Contractor staff will work on-site while performing major tasks (e.g. design confirmation; acceptance testing; training; pilot etc.), as needed.
• During the Warranty and Maintenance and Operations phases the Contractor will staff the Project Office in a manner sufficient to successfully support the PRWIC Program. It is expected that at least one (1) of the developers that participated during the Development and Implementation be assigned full-time dedicated to work on site during this period. PRWIC will have direct communication with this staff.
Pregunta 45
03/19/2026 03:45pm - (10220) GM Sectec, Corp
41. According to Section 8.3.3, Page 71 Staff Qualifications, Help Desk Services.
Is any Spanish dialect acceptable, or must Help Desk staff speak Puerto Rican Spanish?
Respuesta
Respuesta
04/11/2026 07:40pm
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
The requirements described are the minimum, but PRWIC expectations is that the bidders proposes a modern platform that includes dashboard, tracking, reports, etc. The help desk staff should speak PR Spanish.
Pregunta 46
03/19/2026 03:45pm - (10220) GM Sectec, Corp
42. According to Section 8.1.3, pg. 56 Analysis and Design.
In order to comply with the accelerated Project Plan, can the Program clarify whether JAD sessions may be conducted concurrently across multiple functional areas using designated subject matter experts (SMEs), and whether these SMEs will be authorized to make decisions and provide final validation on behalf of their respective areas, or if executive stakeholder participation is required for all sessions?
Respuesta
Respuesta
04/11/2026 07:41pm
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
Yes, SME's that will be assigned will be authorized to make decisions and provide final validation on behalf of their respective areas.
Pregunta 47
03/19/2026 04:00pm - (10220) GM Sectec, Corp
43. Within the ASG portal section designated for submitting proposal documents, there is a field labeled "Correo Electrónico incluído en el Anejo I".
Could you please confirm this space is meant to write the same email address identified as the bidder’s contact information in Schedule I - Bidder's Proposal Endorsement of the RFP?”
Respuesta
Respuesta
04/07/2026 10:34am
Orlando Collazo Rivera (Comprador)
Yes. The field labeled “Correo Electrónico incluído en el Anejo I” within the ASG portal is intended for the Bidder to enter the same email address provided in Schedule I – Bidder’s Proposal Endorsement of the RFP.
Pregunta 48
03/20/2026 11:10am - (11889) Intervoice Communication of Puerto Rico, Inc.
RFC-001 Contract Duration Contradiction — D&I Phase Length [STRUCTURAL] RFP Reference Schedule VI, Section 6 (Contract Period), Page 51; Schedule VI §5.1; §9 Basis for RFC The RFP states: "Development and Implementation Phase approximately twenty-six (24) months." The written word and the numeral are directly contradictory, creating a 2-month discrepancy. Additionally, the sample project schedule in Section 9 shows contract start October 1, 2026 and D&I completion September 29, 2028, which reflects a 24-month span, yet the written text says "twenty-six." Clarification Requested (a) Please confirm the definitive authorized duration of the Development and Implementation (D&I) Phase: is it twenty-four (24) months or twenty-six (26) months? (b) Please confirm whether the sample project schedule in Section 9 reflects PRWIC's actual target timeline or is illustrative only.
Respuesta
Respuesta
04/11/2026 07:42pm
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
The referenced sentence should read twenty-four (24) months. The project schedule presented in the RFP Section 9 is an illustrative timeline. Please refer to questions #28, #34 & #35 related to project duration.
Pregunta 49
03/20/2026 11:11am - (11889) Intervoice Communication of Puerto Rico, Inc.
RFC-002 Inconsistent Use of Calendar Days vs. Business Days [STRUCTURAL] RFP Reference Sections 8.1.10 and 8.1.11, Pages 63–64 Basis for RFC The Pilot Test Plan delivery deadline is expressed in business days (100), while the UAT Testing Plan deadline uses calendar days (90), with no explanation for the different conventions. Clarification Requested Please clarify whether the day-counting convention for all deliverable deadlines in Schedule VI is calendar days or business
Respuesta
Respuesta
04/21/2026 09:13am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
All days referenced in Schedule VI should read "business days"
Pregunta 50
03/20/2026 11:11am - (11889) Intervoice Communication of Puerto Rico, Inc.
RFC-003 Evaluation Minimum Score Threshold vs. Zero-Point Rejection Rule [STRUCTURAL] RFP Reference Section 4.1 and Table 2: Evaluation Criteria, Pages 17–18 Basis for RFC Section 4.1 sets a minimum qualifying threshold of 375 of 750 non-price points, while a separate provision mandates rejection of any proposal earning zero points in any single criterion. A bidder could simultaneously satisfy the threshold and be subject to mandatory rejection. Clarification Requested (a) If a bidder scores zero in one criterion but meets the 375-point aggregate minimum, will the proposal be disqualified or advanced? (b) Is the zero-point rejection rule intended to apply to all four criteria equally, or only to specific mandatory categories?
Respuesta
Respuesta
04/07/2026 10:56am
Orlando Collazo Rivera (Comprador)
(a) Correct. A proposal that receives a score of zero in any evaluation criterion will be disqualified, even if the aggregate score exceeds the minimum threshold of 375 points.
(b) The zero‑point rejection rule applies only to specific mandatory categories.
Pregunta 51
03/20/2026 11:11am - (11889) Intervoice Communication of Puerto Rico, Inc.
RFC-004 Submission Format — Physical vs. Electronic as Official Record [STRUCTURAL] RFP Reference Section 1.12 (Delivery of Proposals), Pages 10–11 Basis for RFC The RFP designates physical submission as the official proposal while simultaneously requiring electronic delivery and imposing different physical submission requirements on out-of-territory bidders. Clarification Requested (a) In the event of any discrepancy between the physical and electronic submissions, which document controls? (b) What is the specific physical submission requirement for out-of-territory bidders — are they exempt from any physical copy requirement, or must they provide a representative copy identical to the electronic version? (c) Does out-of-territory status affect the disqualification standard in any other respect?
Respuesta
Respuesta
04/07/2026 01:46pm
Orlando Collazo Rivera (Comprador)
(a) Electronic submissions of the bid must include a true and exact copy of the proposal documents delivered physically, in accordance with the provisions established in Section 1.6 of Section 1 of the Bid Specifications.
(b) There are no different requirements for bidders outside the territory. All bidders must comply with the delivery requirements established in the Bid Specifications for this RFP.
(c) The status of being an out‑of‑territory bidder does not affect the disqualification standard, as long as the proponent fully complies with all the requirements of the referenced RFP.
Pregunta 52
03/20/2026 11:11am - (11889) Intervoice Communication of Puerto Rico, Inc.
RFC-005 Award Notification References Non-Existent "Attachment I" [STRUCTURAL] RFP Reference Sections 4.5 and 4.6 (Award and Administrative Review), Page 21 Basis for RFC Section 4.5 references "Schedule I" and Section 4.6 references "Attachment I" for the notification email address. Neither Schedule I nor Attachment I exist; the RFP only contains Attachments A through D. Clarification Requested Please identify the correct location within the RFP package where bidders must provide their email address for receipt of the award Resolution and administrative review notification.
Respuesta
Respuesta
04/07/2026 02:09pm
Orlando Collazo Rivera (Comprador)
Please refer to Amendment No. 2 for the referenced RFP.
Pregunta 53
03/20/2026 11:12am - (11889) Intervoice Communication of Puerto Rico, Inc.
RFC-006 Critical Defect Correction Timeline: Testing Stricter Than Production [STRUCTURAL] RFP Reference Section 8.1.10 (UAT), Item I vs. Section 8.2 (Warranty Phase), Item C, Pages 64 & 66 Basis for RFC UAT requires a temporary workaround for critical defects within 24 hours, while the Warranty Phase (live production) allows 5 days for correction of the same category of defect — a less stringent standard for the production environment. Clarification Requested Please confirm whether the 5-day correction timeline for critical defects during the Warranty Phase is intentional. Is there a policy rationale for applying a less stringent standard to live production than to testing?
Respuesta
Respuesta
04/21/2026 09:19am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
PRWIC intention of the 24 hours for high severity system defects workaround is to allow the UAT Phase to continue. This does not imply that in the production environment PRWIC may require a 24 hour workaround too.
Pregunta 54
03/20/2026 11:12am - (11889) Intervoice Communication of Puerto Rico, Inc.
RFC-007 Intellectual Property Ownership — PRWIC, Federal Government, and Contractor [STRUCTURAL] RFP Reference Section 8.1.9 (Copyright) and Schedule VIII, Section B-8, Pages 63 & 87; Schedule VI §8.1.9; Schedule VIII § Clarification Requested (a) How does PRWIC's ownership interact with the Federal Government's irrevocable license — specifically, can PRWIC transfer, license, or restrict access to the deliverables in ways that would conflict with the federal license? (b) May bidders retain ownership of pre-existing intellectual property, frameworks, platforms, or reusable components incorporated into the solution, provided a perpetual license is granted to PRWIC and FNS? (c) What is the treatment of Contractor's pre-existing intellectual property incorporated into deliverables — will it be considered work-made-for-hire, or may the Contractor retain its IP with a license back to PRWIC? (d) Must all third-party licenses be transferred to PRWIC, or may they remain with the contractor and be included in M&O pricing? (e) Must bidders disclose pre-existing IP at the proposal submission stage?
Respuesta
Respuesta
04/21/2026 03:11pm
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
a) Question is not clear.
b) Yes.
c) Pre-existing intellectual property remains the intellectual property of the contractor.
d) No, they remain with the contractor and Bidders may include the costs in the M&O costs.
e) Bidders do not have to disclose pre-existing intellectual property.
Pregunta 55
03/20/2026 11:13am - (11889) Intervoice Communication of Puerto Rico, Inc.
RFC-008 ISO 9510 Shipping Container Standard in Acronym Table [STRUCTURAL] RFP Reference Section 1.1 (Definitions and Acronyms), Page 6 Basis for RFC ISO 9510, a standard for physical shipping containers with passive ventilation, appears in the definitions table of a WIC MIS software procurement. This definition appears to be a copy-paste artifact from an unrelated procurement. Clarification Requested Please confirm whether the ISO 9510 definition in Section 1.1 is intentional and applicable to this procurement.
Respuesta
Respuesta
04/07/2026 02:22pm
Orlando Collazo Rivera (Comprador)
It is an error originating from an unrelated procurement. Please disregard this item for the referenced RFP.
Pregunta 56
03/20/2026 11:13am - (11889) Intervoice Communication of Puerto Rico, Inc.
RFC-009 ISO/IEC 7813-2006 Magnetic Card Standard — Applicability in eWIC Context [TECHNICAL] RFP Reference Section 1.1 (Definitions and Acronyms), Page 7 Basis for RFC ISO/IEC 7813-2006 (magnetic track card data standard) is defined but never referenced in the SOW, functional requirements, or technical specifications. The eWIC program operates under ISO 7816 (smart card/chip) standards. Clarification Requested (a) Does any component of the WIC MIS or eWIC interface rely on magnetic stripe card technology? (b) If not, should ISO 7816 be substituted as the applicable card technology standard?
Respuesta
Respuesta
04/21/2026 09:21am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
a) Yes, the magnetic strip has the participant number to validate the participant over the eWIC system and IVR.
Pregunta 57
03/20/2026 11:13am - (11889) Intervoice Communication of Puerto Rico, Inc.
RFC-010 Consortium & Prime — Minimum Experience Requirement [STRUCTURAL] RFP Reference Schedule V §5.2-B; Schedule VI §10 Basis for RFC The RFP requires three (3) years of experience developing and implementing complex, enterprise-wide Management Information Systems. It is unclear whether this requirement must be met by the prime contractor independently, or whether the combined documented experience of a prime contractor and its named subcontractors collectively satisfies the threshold. Clarification Requested Can a bidder satisfy the minimum experience requirement through the combined and documented experience of the prime contractor and its named subcontractors, or must the prime contractor independently meet this requirement?
Respuesta
Respuesta
04/21/2026 09:23am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
Yes, a bidder can satisfy the minimum experience requirement through the combined and documented experience of the prime contractor and its named subcontractors. Please refer to Schedule V, Section 5.2 .B -Corporate Qualification Experience.
Pregunta 58
03/20/2026 11:13am - (11889) Intervoice Communication of Puerto Rico, Inc.
RFC-011 Consortium & Prime — Division of Roles Between Prime and Subcontractor [STRUCTURAL] RFP Reference Schedule VIII §1-d; Schedule VI §11 Basis for RFC The RFP does not explicitly address whether a named subcontractor may serve as the primary client-facing PMO while the prime contractor is responsible for the MIS technical solution. This ambiguity may preclude bidders from presenting optimal team structures that are compliant with the RFP. Clarification Requested In a joint venture or consortium structure, can the named subcontractor responsible for Program Management and delivery governance serve as the primary client-facing PMO, with the prime contractor responsible for the MIS technical solution? Please confirm whether this formal division of responsibilities is permissible and evaluable under the RFP.
Respuesta
Respuesta
04/21/2026 09:25am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
Primary and secondary business relationships are outside of PRWIC’s control. Either the PMO or the implementer may submit the proposal as the primary contractor.
However, PRWIC must have access to all necessary resources as required, and the primary contractor will be fully responsible for the performance and compliance of the contract.
Pregunta 59
03/20/2026 11:13am - (11889) Intervoice Communication of Puerto Rico, Inc.
RFC-012 Consortium & Prime — Past Performance Presentation [STRUCTURAL] RFP Reference Schedule VIII §1-d; Schedule V §5.2-C Basis for RFC The RFP does not specify whether qualifications and past performance of all consortium members may be presented collectively under a single Section 5.2 narrative, or whether each member must submit separate past performance documentation. This creates uncertainty about how to structure the proposal for a multi-entity team. Clarification Requested In a joint venture or consortium structure, may the qualifications and past performance of all consortium members be presented collectively under a single Section 5.2 narrative, or must each member submit separate past performance documentation?
Respuesta
Respuesta
04/21/2026 09:26am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
Responders must select up to two (2) clients from similar past or current projects using Attachment D – Past Performance Form. In the case of a joint venture, the responder must present past performance references in which they served as the Primary Contractor.
Pregunta 60
03/20/2026 11:14am - (11889) Intervoice Communication of Puerto Rico, Inc.
RFC-013 Consortium & Prime — Exclusivity of Subcontractors [STRUCTURAL] RFP Reference Section 3.3; Schedule VIII §1-d Basis for RFC The RFP prohibits a person or legal entity from participating as a member of the work team of more than one bidder. It is ambiguous whether this restriction applies to subcontractors — specifically, whether a subcontractor can be named in only one consortium's proposal even if they are not the prime contractor. Clarification Requested: Does the restriction on participating as a member of more than one bidder's work team apply to subcontractors — specifically, can a subcontractor be named in only one consortium's proposal even if they are not the prime contractor?
Respuesta
Respuesta
04/21/2026 09:28am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
A subcontractor cannot be listed or otherwise participate as part of the work team for more than one bidder—whether acting under a prime contractor, within a consortium structure, or as a specialized supporting entity.
This exclusivity requirement is intended to ensure fairness, avoid conflicts of interest, and maintain the integrity of the competitive procurement process
Pregunta 61
03/20/2026 11:14am - (11889) Intervoice Communication of Puerto Rico, Inc.
RFC-014 Bid Bond Basis Creates Potential for Price Gaming [OPERATIONAL] RFP Reference Section 5.9(a) (Bid Bond), Page 24; Section 5.9-a Basis for RFC The Bid Bond is calculated as 5% of the bidder's own Total Price in Schedule #1. Because bidders self-determine the bond amount, there is an incentive to understate the D&I phase price to reduce bond exposure. Additionally, the RFP does not clarify whether the physically signed bid bond instrument must be submitted simultaneously with the proposal or may follow within a defined period. Clarification Requested (a) Is there an independent government estimate or floor value against which the 5% bond will be calculated? (b) Will PRWIC publish a budget reference or estimated contract value? (c) Is the bid bond amount calculated on the bidder's own proposed D&I total as submitted in the cost proposal? (d) Must the physically signed bid bond instrument be submitted simultaneously with the proposal on the submission deadline, or may it follow within a defined period after submission?
Respuesta
Respuesta
04/08/2026 08:34am
Orlando Collazo Rivera (Comprador)
a) No.
b) No.
c) Yes. As requested, the bid bond amount must be calculated based on the bidder’s own proposed Total Price Schedule #1 – Development and Implementation Phase (total cost for Items A to I) as submitted in the cost proposal.
d) Yes, the physically signed bid bond must be submitted simultaneously with the proposal as part of the required documentation.
Pregunta 62
03/20/2026 11:15am - (11889) Intervoice Communication of Puerto Rico, Inc.
RFC-015 Incumbent Contractor Cooperation Is Non-Binding and Uncompensated [OPERATIONAL] RFP Reference Section 8.1.4 (Data Migration), Item D, Page 59 Basis for RFC The RFP states the current MIS contractor "will be available to provide technical assistance" — language that is non-binding. No cooperation scope, timeline, compensation, or conflict-of-interest provisions are defined, and the incumbent may also submit a competing proposal. Clarification Requested (a) Will PRWIC contractually obligate Contractor #1 to provide technical assistance to the selected contractor — and if so, under what instrument and at what compensation level? (b) What is the scope, format, and timeline of required cooperation — specifically, what system documentation, data dictionary, API specifications, and extract formats will Contractor #1 be required to deliver? (c) Who bears the financial risk and schedule impact if Contractor #1 fails to cooperate?
Respuesta
Respuesta
04/21/2026 09:31am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
The Agency will retain responsibility for coordinating any transition activities between the current contractor and the selected contractor.
To the extent applicable, the Agency will facilitate access to necessary information and resources to support an orderly transition.
Any transition-related coordination, including the provision of documentation or technical support, will be managed by the Agency in accordance with applicable contractual and administrative frameworks.
Bidders should prepare their proposals based on the assumption that the Agency will oversee and coordinate transition activities to ensure continuity of operations.
Pregunta 63
03/20/2026 11:15am - (11889) Intervoice Communication of Puerto Rico, Inc.
RFC-016 Incumbent — Access to Technical Documentation Pre-Award [COMPETITIVE] RFP Reference Schedule VI §8.1.4-D Basis for RFC The RFP states that the current PRWIC MIS M&O contractor will be available to provide technical assistance during data migration. However, it does not address whether all qualified bidders will have access to current system documentation (data dictionaries, schema documentation, interface specifications) prior to proposal submission, or whether a structured transition briefing with the incumbent will be made available to all bidders — not just the awarded contractor. Clarification Requested (a) Will PRWIC facilitate a structured transition briefing with the incumbent for all qualified bidders, or will this access be limited to the awarded contractor? (b) Will bidders have access to current system documentation (data dictionaries, schema documentation, interface specifications) prior to proposal submission?
Respuesta
Respuesta
04/21/2026 09:32am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
PRWIC will facilitate a structured transition process following contract award and the documentation will be made available, as necessary, to support transition and implementation activities.
Pregunta 64
03/20/2026 11:15am - (11889) Intervoice Communication of Puerto Rico, Inc.
RFC-017 Incumbent — Eligibility as Subcontractor or Transition Advisor [COMPETITIVE] RFP Reference Schedule VI §8.1.4-D; §11 Basis for RFC The RFP does not address whether the current M&O contractor (Contractor #1) is eligible to participate as a subcontractor or transition advisor in a competing consortium's proposal. Given the incumbent's access to system architecture, data, and operational knowledge, this creates a potential competitive advantage issue. Clarification Requested (a) Is the current M&O contractor (Contractor #1) eligible to participate as a subcontractor or transition advisor in a competing consortium's proposal? (b) If so, are there conflicts of interest restrictions or disclosure requirements that would apply?
Respuesta
Respuesta
04/21/2026 09:34am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
The current contractor remains subject to the terms and conditions of its existing agreement with the Agency, including any applicable confidentiality and non-disclosure obligations.
During the procurement process, the current contractor may not provide support, advisory services, or non-public information to any bidder in a manner that would create an unfair competitive advantage or compromise the integrity of the procurement process.
Pregunta 65
03/20/2026 11:15am - (11889) Intervoice Communication of Puerto Rico, Inc.
RFC-018 No Transition-In Period or Incumbent Knowledge Transfer Framework [OPERATIONAL] RFP Reference Section 8.4 (Close-out and Transition), Pages 73–74Basis for RFC The RFP defines transition-out obligations for the departing contractor but contains no transition-in framework, shadowing period, data access schedule, API documentation obligations from Contractor #1, or PRWIC staff knowledge transfer plan. Clarification Requested (a) What period is contemplated for the new contractor to shadow the incumbent and access the existing WIC MIS prior to D&I phase commencement? (b) What technical documentation is Contractor #1 required to deliver to the new contractor, and by what date? (c) What is PRWIC's plan for orienting the new contractor to program operations, staff workflows, and clinic networks? (d) Will there be an overlap period between the M&O contract expiration (September 30, 2027) and new system go-live to prevent a service continuity gap?
Respuesta
Respuesta
04/21/2026 09:38am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
The Agency will coordinate a structured transition process following contract award to support the implementation of the new system.
The specific details, timing, and deliverables associated with transition activities will be defined as part of the post-award planning and contractual process.
Bidders should assume that transition activities will be managed in a manner that supports continuity of operations and minimizes service disruption.
Pregunta 66
03/20/2026 11:16am - (11889) Intervoice Communication of Puerto Rico, Inc.
RFC-019 External Platforms — Build vs. Integrate vs. Acquire Decision Undefined [TECHNICAL] RFP Reference Schedule VI, Sections 3.3, 3.4, 8.1.2, and Expected Environment Table, Pages 47–57; Pages 56–57 Basis for RFC The RFP identifies multiple platforms currently operated by Contractor #2 (BackOffice 360, Clinic Monitoring, Breastfeeding Peer Counseling, Food Selection and Evaluation, Mobile App, Chatbot, Queue System) that will be "Linked to System Developed," but does not specify whether the selected contractor must re-develop, integrate with, acquire, or adopt a hybrid approach. Clarification Requested (a) For each platform operated by Contractor #2, please specify the required disposition: full re-development, integration via API, acquisition/ownership transfer, or hybrid? (b) Will PRWIC facilitate access to technical documentation for BackOffice 360, Clinic Monitoring, Breastfeeding Peer Counseling, Food Selection & Evaluation, and the mobile app prior to proposal submission? (c) For each major system category, can PRWIC clarify whether the expectation is: full decommissioning and replacement, retention as-is with integration, or re-engineering and enhancement? (d) Will PRWIC facilitate any contractual transition from Contractor #2 to the selected contractor for these platforms? The cost implications of each scenario differ by orders of magnitude.
Respuesta
Respuesta
04/21/2026 09:40am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
a) Keeping the current external platforms is not an option. PRWIC expectation is that these functionalities be integrated into the new MIS system. (Re-developed). Bidders must keep in mind PRWIC goals described in Schedule VI, Section 4.
b) PRWIC will facilitate access to the technical documentation to the selected contractor.
c) PRWIC will accept a COTS/SAM/SaaS solution, a custom‑developed solution built from scratch, or a hybrid approach in which certain modules are COTS‑configured and others are custom‑built, as long as the proposed solution meets the needs identified in Attachments A and B and supports the PRWIC Modernization Goals described in Schedule VI, Section 4.
d) N/A
Pregunta 67
03/20/2026 11:16am - (11889) Intervoice Communication of Puerto Rico, Inc.
RFC-021 Architecture — Target Reference Architecture Undefined [TECHNICAL] RFP Reference Schedule VI §4 (Modernization Goals); §8.1.3 Basis for RFC The RFP emphasizes modernization, interoperability, and scalability but does not define a target reference architecture (e.g., cloud-first, microservices, service-oriented architecture, or hybrid). Without this guidance, bidders cannot align their proposed architectures with PRWIC's expectations or understand whether architectural approach will be a differentiator in scoring. Clarification Requested (a) Is there a defined target reference architecture that PRWIC expects or prefers — for example, cloud-first, microservices, service-oriented architecture, or hybrid? (b) Will proposals that adopt a specific architectural pattern receive differentiated scoring under the Technical Proposal criteria?
Respuesta
Respuesta
04/21/2026 09:41am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
PRWIC is looking for a modern architecture, designed to adapt to rapid change, scale easily, and take advantage of current technologies. We can mention the following characteristics, among others:
1. Microservices
2. Event-driven architecture
3. Defined APIs
4. Load balancing: Efficient traffic distribution
5. Autoscaling: Automatic adjustment of resources on demand.
6. Open standards: Use of protocols such as HTTP, JSON, XML
7. Cross-platform compatibility: Works on different operating systems and devices.
8. Integration with third parties: Ability to connect with other services via APIs or middleware.
Pregunta 68
03/20/2026 11:17am - (11889) Intervoice Communication of Puerto Rico, Inc.
RFC-022 eWIC Contractor Coordination Obligations Undefined [TECHNICAL] RFP Reference Section 8.1.6 (WIC MIS/eWIC Interface Development), Page 60; Schedule VI §4; §8.1.6; Attachment B Basis for RFC The RFP requires the selected contractor to coordinate with the "eWIC contractor" (CDP WIC Direct) but does not address thatcontractor's current contract status, availability during D&I, cost allocation for interface delays, or dispute resolution if the eWIC contractor fails to cooperate. Additionally, it is unclear whether PRWIC anticipates transitioning to a different EBT processor during the contract period. Clarification Requested (a) Is CDP WIC Direct currently under contract with PRWIC, and will that contract remain in effect throughout the D&I phase? (b) What are the specific technical cooperation and API documentation delivery obligations of the eWIC contractor toward the selected MIS contractor? (c) If interface delays are caused by the eWIC contractor's failure to cooperate, will the selected MIS contractor be entitled to a schedule extension, cost adjustment, or both? (d) Is the interface requirement limited to maintaining the existing WIC Direct relationship for the duration of this contract, or does PRWIC anticipate transitioning to a different EBT processor? (e) If a processor change is possible, who bears the transition costs?
Respuesta
Respuesta
04/21/2026 09:43am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
a) Current eWIC Contractor will remain in effect through the D&I phase.
b&c) Documentation will be made available, as necessary, to support transition and implementation activities.
c) Any situation or issues that arises will be managed by the agency within the monitoring and control mechanism established for the project execution.
d) The current eWIC contract was signed in February 2026 with an effective period of 5 years.
e) N/A
Pregunta 69
03/20/2026 11:17am - (11889) Intervoice Communication of Puerto Rico, Inc.
RFC-023 Architecture — Integration Modes by Platform Not Specified [TECHNICAL] RFP Reference Schedule VI §3.3; Page 48 Basis for RFC The RFP describes multiple integrations across EBT, vendor systems, healthcare provider portals, mobile, and contact center platforms but does not specify the required integration mode (real-time/transactional, batch, or event-driven) for each. This prevents accurate architectural planning and cost estimation. Clarification Requested For each major integration category, can PRWIC specify which must be: (a) real-time/transactional, (b) batch, or (c) event-driven? This specifically applies to the MIS-EBT interface, the mobile app sync, the healthcare provider portal, and the BackOffice 360 platform
Respuesta
Respuesta
04/22/2026 08:41am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
PRWIC applications under the scope of this RFP are real time/transactional.
Pregunta 70
03/20/2026 11:17am - (11889) Intervoice Communication of Puerto Rico, Inc.
RFC-024 Architecture — AI and Chatbot Scope and Governance Requirements [TECHNICAL] RFP Reference Schedule VI §3.3; §4; AI Framework reference Basis for RFC The Frutilina Chatbot AI is currently hosted by a Third Party. The RFP references the Framework for State, Local, Tribal, and Territorial Use of Artificial Intelligence for Public Benefit Administration but does not specify whether the selected contractor must redevelop the chatbot, take over the existing third-party contract, or whether the chatbot is out of scope. Minimum AI governance expectations are not defined.Clarification Requested (a) Must the selected contractor redevelop the chatbot as a new AI-compliant solution, take over the existing third-party contract, or is the chatbot out of scope? (b) What are PRWIC's minimum expectations for AI governance compliance, including explainability, bias mitigation, and auditability under the referenced AI Framework?
Respuesta
Respuesta
04/11/2026 07:45pm
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
Frutilina Chatbot AI – This chatbot, which uses artificial intelligence, provides information 24/7 in an automated manner. In addition, the chatbot allows certain transactions to be carried out, such as scheduling appointments. The chat's data is based on the current procedures and policies of the Program that are "fed" to the artificial intelligence engine.
PRWIC expectation is to re-develop this functionality as it is used today which is limited to the inquiry about policies and procedures and to provide consultation on how the participant can do their appointments and which complies with the Framework for State, Local, Tribal, and Territorial Use of Artificial Intelligence for Public Benefit Administration.
Pregunta 71
03/20/2026 11:18am - (11889) Intervoice Communication of Puerto Rico, Inc.
RFC-025 Architecture — Online Shopping & Mobile Payment Roadmap [TECHNICAL] RFP Reference Schedule VI §4; AI Framework reference Basis for RFC The Modernization Goals reference participant-facing digital access and the AI Framework for Public Benefit Administration. It is unclear whether PRWIC intends to implement online shopping or mobile payment capabilities (e.g., PayDirect-equivalent) during the period of this contract, or whether these capabilities are out of scope but should be considered in the architecture for future integration purposes. Clarification Requested (a) Does PRWIC intend to implement online shopping or mobile payment capabilities during the period of this contract? (b) Or are these capabilities out of scope but should be considered in the architecture to facilitate future integration? This determination has material implications for the proposed technical architecture and cost.
Respuesta
Respuesta
04/22/2026 08:43am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
a) Mobile Payment is already implemented. Online Shopping may be considered in the future, but not under the scope of this contract.
b) N/A.
Pregunta 72
03/20/2026 11:18am - (11889) Intervoice Communication of Puerto Rico, Inc.
RFC-026 Contracting Party Identity Inconsistent Across Schedule VIII [STRUCTURAL] RFP Reference Schedule VIII (General Solicitation Terms), Pages 81–88 Basis for RFC Schedule VIII alternates among "Puerto Rico," "the State," "PRWIC Program," and "Puerto Rico Department of Health" as the contracting party, each of which is a distinct legal entity with different contracting authority. Clarification Requested (a) Is the contracting authority the Administration of General Services (ASG)? (b) Is the contracting program PRWIC, acting under PRDoH's authority? (c) What are the respective roles of ASG, PRWIC, and PRDoH in contract execution, administration, and enforcement?
Respuesta
Respuesta
04/21/2026 09:46am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
The contract will be executed between the selected contractor and the Puerto Rico Department of Health (PRDoH).
The Office of the Administration of General Services (ASG) retains control of the procurement process until the contract is awarded.
Contract execution is the responsibility of PRDoH, while contract administration and enforcement will be carried out by PRWIC.
Pregunta 73
03/20/2026 11:18am - (11889) Intervoice Communication of Puerto Rico, Inc.
RFC-027 Attachment B Is Severely Truncated [TECHNICAL] RFP Reference Attachment B (Additional Functional Requirement Specifications), Pages 90–92s for RFC Attachment B contains only three functional requirement specification sheets (FReD 3.1.1.3, 3.1.1.4, and 3.9.1.4), while multiple RFP sections and Schedule V reference Attachment B as a complete specification document requiring detailed compliance narratives from bidders. Clarification Requested (a) How many total FReD specification sheets should Attachment B contain? (b) Will PRWIC issue an amendment publishing the complete Attachment B, and will the proposal due date be extended to allow adequate review and response time? (c) Until the complete document is published, should bidders note their inability to fully respond to Schedule V compliance requirements, or should they address only the three specifications currently available?
Respuesta
Respuesta
04/22/2026 08:45am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
a) Attachment B includes only some details for those three (3) FReD requirements. The contractor must discuss each requirement included in Attachment A with the corresponding areas during the Analysis Phase.
b) No amendment will be published for Attachment B.
c) N/A
Pregunta 74
03/20/2026 11:19am - (11889) Intervoice Communication of Puerto Rico, Inc.
RFC-028 No Hardware or Infrastructure Specifications Provided by OIAT [TECHNICAL] RFP Reference Section 8.3.1 (Hardware and Software Hosting), Pages 67–68; Schedule VI §8.3.1; §8.1.3; Schedule VIII §1- No guidance is provided on whether cloud hosting is permissible as an alternative. Clarification Requested (a) What server hardware, storage capacity, and network bandwidth will OIAT provision, and on what timeline? (b) Is cloud hosting on U.S.-based Azure Gov or AWS GovCloud platforms permissible as an alternative to PRDOH-OIAT on-premise infrastructure? (c) Must the contractor use PRDOH-OIAT infrastructure exclusively for production environments? (d) Are there approved cloud providers or hosting environments — e.g., Azure Government, AWS GovCloud, or equivalent FedRAMP-authorized platforms? (e) Must cloud environments be FedRAMP-authorized at Moderate or High impact level? (f) Should bidders include hardware procurement and infrastructure costs in their cost proposals, or price $0 for hardware and note the OIAT provision as an assumption? (g) What are the disaster recovery and redundancy specifications?
Respuesta
Respuesta
04/22/2026 08:48am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
a) PRWIC and PRDOH OIAT will provide all necessary hardware and software to support the processing of the implemented System.
b) Cloud use such as AWS is allowed.
c) Must use on-premises infrastructure in OIAT or Cloud fot the development, UAT and production environments.
d) Yes, AWS as an example.
e) FedRAMP-authorized at Moderate.
f) Hardware procurement is outside the scope of this RFP
g) Please refer to Attachment VI, Section 8.3.1., Item E.
Final
Pregunta 75
03/20/2026 11:19am - (11889) Intervoice Communication of Puerto Rico, Inc.
RFC-029 Functional Requirements — Mandatory vs. Preferred Classification Absent [TECHNICAL] RFP Reference Attachment A; Section 4.1; Table 2 Basis for RFC Attachment A contains the WIC MIS Functional Requirements Matrix across 6 tables with 640+ discrete requirements. The RFP does not classify requirements as mandatory/must-comply versus preferred/should-comply, nor does it distinguish requirements critical for Day 1 go-live from those acceptable for post-launch enhancement. This prevents bidders from accurately scoping, scheduling, and pricing their proposals. Clarification Requested (a) Can PRWIC classify each requirement or requirement category as: mandatory/must-comply versus preferred/should-comply, and critical for Day 1 go-live versus acceptable for post-launch enhancement? (b) If this classification is not available before submission, will it be provided at the pre-proposal meeting?
Respuesta
Respuesta
04/11/2026 07:47pm
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
Table 1 (FReD) – The table provides the Required/Optional column.
• Table 2 (Enhancements) – The table provides to describe how the bidder will meet the enhancement. They are all required.
• Table 3 (Reports) – The table provides the Required/Addressable/Optional Column.
• Table 4 (Customizations) - The table provides to describe how the bidder will meet the enhancement. They are all required.
• Table 5 (External Platforms) – The table provides to describe how the bidder will meet the interface integration.
Pregunta 76
03/20/2026 11:19am - (11889) Intervoice Communication of Puerto Rico, Inc.
RFC-030 Functional Requirements — COTS vs. Custom Development Expectation [TECHNICAL] RFP Reference Schedule V §5.3.3; Pages 40–41 Basis for RFC The RFP does not specify whether bidders should respond to Attachment A requirements by assuming configuration of a COTS/SAM-based solution, custom development from scratch, or a hybrid approach where some modules are COTS-configured and others are custom-built. This ambiguity may lead to non-comparable proposals that cannot be meaningfully evaluated against one another. Clarification Requested In responding to Attachment A, should bidders assume: (a) configuration of a COTS or SAM-based solution, (b) custom development from scratch, or (c) a hybrid approach? (b) Will proposals that demonstrate a COTS-first approach with targeted customization be evaluated differently from fully custom development proposals?
Respuesta
Respuesta
04/21/2026 09:48am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
Please refer to Question #1.
Pregunta 77
03/20/2026 11:19am - (11889) Intervoice Communication of Puerto Rico, Inc.
RFC-031 Functional Requirements — Formal Acceptance Criteria Not Defined [TECHNICAL] RFP Reference Schedule V §5.3.3-G; §8.1.10 Basis for RFC The RFP does not provide formal, measurable acceptance criteria for deliverable categories, nor does it define formal entry and exit criteria for UAT, Integrated Pilot, and Island-Wide Rollout phases. Without pre-defined acceptance criteria, bidders cannot accurately estimate rework cycles, contingency costs, or schedule buffers. Clarification Requested (a) Will PRWIC provide formal, measurable acceptance criteria for each deliverable category prior to contract execution, or will acceptance criteria be developed jointly during the Project Planning phase? (b) What is the formal entry and exit criteria for UAT, Integrated Pilot, and Island-Wide Rollout phases?
Respuesta
Respuesta
04/21/2026 09:52am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
a) Deliverables acceptance criteria will be developed jointly during the Project Planning phase.
b) Please refer to FNS Hanbok 901-Section A15.2.5.1 for details on Entry/Exit Criteria for UAT. FNS approval is required before going to Pilot and Statewide Rollout.
These topics must be included in the Project Work Plan and Test, Pilot and Rollout Plans to be developed during the planning phase.
Pregunta 78
03/20/2026 11:20am - (11889) Intervoice Communication of Puerto Rico, Inc.
RFC-032 Staffing — IRS Publication 1075 Applicability in Puerto Rico [STRUCTURAL] RFP Reference Schedule VI §10; IRS Publication 1075 Basis for RFC The RFP states that IRS Publication 1075 requires systems containing Federal Tax Information to be operated and maintained by personnel physically located within the United States. It is ambiguous whether this requirement applies to subcontractor personnel as well as prime contractor staff, and whether Puerto Rico satisfies the "within the United States" requirement under IRS Publication 1075 for this specific purpose. Clarification Requested (a) Does this requirement apply to all subcontractor personnel as well as prime contractor staff? (b) Does Puerto Rico satisfy the "within the United States" requirement under IRS Publication 1075 for this purpose?
Respuesta
Respuesta
04/21/2026 09:54am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
Yes to questions a and b.
Pregunta 79
03/20/2026 11:20am - (11889) Intervoice Communication of Puerto Rico, Inc.
RFC-034 Staffing — Project Office Physical Space Requirement [OPERATIONAL] RFP Reference Schedule VI §10 Basis for RFC The RFP requires the Contractor to establish a Project Office in Puerto Rico for the duration of the contract for at least key staff and help desk staff. It does not specify whether this must be a dedicated, separately leased physical office space, or whether the contractor may operate from a co-located arrangement within PRWIC State Office facilities or a partner organization's existing Puerto Rico office. Clarification Requested Must the Project Office be a dedicated, separately leased physical office space, or may the Contractor operate from a co-located arrangement within PRWIC State Office facilities or a partner organization's existing Puerto Rico office?
Respuesta
Respuesta
04/21/2026 09:55am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
It must be a separate physical office space.
Pregunta 80
03/20/2026 11:20am - (11889) Intervoice Communication of Puerto Rico, Inc.
RFC-035 CSSLP Certification — Timing, Scope, Affiliation, and Cost Undefined [TECHNICAL] RFP Reference Section 8.1.7 (Software Development Certification), Pages 60–61; Schedule VI §8.1.7 Basis for RFC The RFP requires CSSLP certification prior to the Integrated Pilot but does not specify whether the CSSLP must be a contractor employee or third party, the certifying body or report format, the Price Schedule line item for this cost, or whether certification covers external platform integrations. It is also unclear whether the CSSLP must be a full-time employee of the prime contractor or may be a named consultant or subcontractor staff member, and at what phase the certification report must be formally submitted. Clarification Requested (a) Must the CSSLP be an employee of the selected contractor, a named consultant, subcontractor staff member, or an independent third party? (b) What certifying body, certification methodology, and deliverable format will PRWIC accept? (c) Must the CSSLP certification cover all external platform integrations (eWIC interface, Contractor #2 platforms, OIAT infrastructure), or only core MIS software? (d) In which Price Schedule line item should the CSSLP certification cost be included? (e) What specific FNS or USDA standards must the certification report address? (f) At what phase
Respuesta
Respuesta
04/22/2026 08:51am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
a) The CSSLP can be an employee or contractor who certifies that the system complies with the CSSLP framework, NIST 800-53, and FNS Handbook 901.
b) A certifying body is not required.
c) There will be no external platforms as at present, but an MIS system that integrates all the required functionalities.
d) External Platforms will be integrated as functionalities within the MIS system.
e) FNS standards are align with industry standards such as NIST, OWASP, ISO/IEC 27034.
f) Security must be considered throughout the development of the system so that in the end a secure system is delivered.
Pregunta 81
03/20/2026 11:20am - (11889) Intervoice Communication of Puerto Rico, Inc.
RFC-036 Staffing — On-site vs. Remote Presence During Non-Training Phases [OPERATIONAL] RFP Reference Schedule VI §8.1.8; §10 Basis for RFC Training requires in-person delivery across all regions. However, the RFP does not clarify whether on-site presence in Puerto Rico is required for development, testing, and M&O activities, or whether remote work is acceptable for non-training phases provided the Project Office is staffed with key personnel as required. Clarification Requested Beyond training activities, should bidders assume on-site presence in Puerto Rico for development, testing, and M&O activities, or is remote work acceptable for non-training phases, provided the Project Office is staffed with key personnel as required?
Respuesta
Respuesta
04/21/2026 09:57am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
Please refer to Question #41.
Pregunta 82
03/20/2026 11:21am - (11889) Intervoice Communication of Puerto Rico, Inc.
RFC-037 "Section 3.10" Cross-Reference Does Not Exist in RFP [STRUCTURAL] RFP Reference Schedule V, Section H (Staffing Proposed), Page 41 Basis for RFC Schedule V directs bidders to provide resumes for staff identified in "RFP Section 3.10," which does not exist. The staffing requirements appear to be located in Schedule VI, Section 10. Clarification Requested (a) Is "Section 3.10" intended to refer to Schedule VI, Section 10 (Bidder Staffing)? (b) Please provide the complete list of required positions for which resumes must be submitted.
Respuesta
Respuesta
04/21/2026 09:59am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
a) Yes.
b) Resumes must be provided for all the proposed project staff which includes the key staff and the project staff listed in this section. Additional staff is optional, but bidders are encouraged to include their resumes and narrative, if desired.
Pregunta 83
03/20/2026 11:21am - (11889) Intervoice Communication of Puerto Rico, Inc.
RFC-038 "Section 3.8.3.3" Cross-Reference Does Not Exist in RFP [STRUCTURAL] RFP Reference Section 8.4.3 (Service Levels), Page 74 Basis for RFC Section 8.4.3 references "Performance standards for call handling — Section 3.8.3.3," which does not exist. The call handling standards appear to be in Section 8.3.3 (Help Desk Services), suggesting the document was renumbered after cross-references were written. Clarification Requested (a) Is the intended reference Section 8.3.3 (Help Desk Services)? (b) Please provide the specific call handling metrics (e.g., response time, abandonment rate, first-call resolution) that will govern SLA compliance.
Respuesta
Respuesta
04/21/2026 03:14pm
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
a) Help Desk Services should be Section 8.3.3. and Service Levels should be Section 8.4.3.
b) The call handling metrics are in Section 8.3.3.
Pregunta 84
03/20/2026 11:21am - (11889) Intervoice Communication of Puerto Rico, Inc.
RFC-039 Evaluation — Transition Risk as Scored Criterion [COMPETITIVE] RFP Reference Section 4.1; Table 2 Basis for RFC The Technical Proposal carries 550 of 1,000 evaluation points. The RFP does not confirm whether the Evaluation Committee will specifically assess the proposer's plan for managing transition risk from the current two-contractor environment — including coexistence strategy, migration sequencing, and cutover risk mitigation — as a distinct, scorable element. Clarification Requested Will the Evaluation Committee specifically assess the proposer's plan for managing transition risk from the current two-contractor environment — including coexistence strategy, migration sequencing, and cutover risk mitigation — as a distinct, scorable element within the Technical Proposal criteria?
Respuesta
Respuesta
04/21/2026 10:00am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
Please refer to question #62.
Specific evaluation points are assigned by the Evaluation Technical Committee.
Pregunta 85
03/20/2026 11:21am - (11889) Intervoice Communication of Puerto Rico, Inc.
RFC-040 Evaluation — Consortium Combined Capabilities Assessment [COMPETITIVE] RFP Reference Section 4.1.3; Schedule V §5.2-B Basis for RFC Under the Technical Capacity evaluation criteria, the RFP does not specify whether the Evaluation Committee will assess the combined technical capabilities of the prime contractor and all named subcontractors as a single integrated team, or whether the prime contractor's individual technical capacity will be evaluated separately from subcontractor contributions. Clarification Requested Under the Technical Capacity evaluation criteria, will the Evaluation Committee assess the combined technical capabilities of the prime contractor and all named subcontractors as a single integrated team, or will the prime contractor's individual technical capacity be evaluated separately from subcontractor contributions?
Respuesta
Respuesta
04/21/2026 10:01am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
Bidders staff will be evaluated as an integrated Team.
Pregunta 86
03/20/2026 11:21am - (11889) Intervoice Communication of Puerto Rico, Inc.
RFC-041 Evaluation — WIC-Specific vs. Equivalent Federally-Regulated Experience [COMPETITIVE] RFP Reference Section 4.1; Schedule IV Basis for RFC The RFP does not clarify whether the evaluation formally or informally gives preference to proposers with demonstrated experienceIntervoice Communication of P.R., Inc. 18
specifically in WIC MIS implementations, versus proposers with equivalent scale and complexity experience in other federally regulated health information systems (e.g., Medicaid MIS, SNAP, Title V). This ambiguity affects how bidders should structure their past performance narratives. Clarification Requested Does the evaluation give preference — formally or informally — to proposers with demonstrated WIC MIS implementation experience, versus proposers with equivalent scale and complexity experience in other federally regulated health information systems (e.g., Medicaid MIS, SNAP, Title V)?
Respuesta
Respuesta
04/21/2026 10:03am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
Schedule V, Section 5.2, Item B describes the minimum required experience. Also, Schedule VI, Section 10 describes Key staff (PM. BA & DL) WIC Experience preferred.
Specific evaluation points are assigned by the Evaluation Technical Committee.
Pregunta 87
03/20/2026 11:22am - (11889) Intervoice Communication of Puerto Rico, Inc.
RFC-042 Evaluation — Evaluation Committee Composition [COMPETITIVE] RFP Reference Section 4.1; Schedule VI §7 (PRWIC Project Resources) Basis for RFC The RFP does not confirm whether the Bid Evaluation Committee will include technical representatives from PRDOH-OIAT in addition to PRWIC program staff, or whether an independent Quality Assurance Contractor will participate in the evaluation process as a technical advisor. Clarification Requested (a) Can PRWIC confirm whether the Bid Evaluation Committee will include technical representatives from PRDOH-OIAT in addition to PRWIC program staff? (b) Will an independent Quality Assurance Contractor participate in the evaluation process as a technical advisor?
Respuesta
Respuesta
04/11/2026 07:49pm
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
The composition of the Evaluation Committee shall remain confidential. The identities of its members will not be disclosed at any stage of the procurement process in order to safeguard the integrity, impartiality, and independence of the evaluation.
Pregunta 88
03/20/2026 11:22am - (11889) Intervoice Communication of Puerto Rico, Inc.
RFC-043 Process — Prior Procurement History for WIC MIS Modernization [COMPETITIVE] RFP Reference Section 1.3; Section 1.4 Basis for RFC The RFP does not disclose whether this procurement has been published previously under a different RFP reference number, or whether there have been prior attempts to procure a WIC MIS modernization that were cancelled, declared void, awarded and subsequently terminated. This information would allow bidders to understand the procurement context and avoid known issues. Clarification Requested Has this procurement been published previously under a different RFP reference number, or have there been prior attempts to procure a WIC MIS modernization that were cancelled, declared void, or awarded and subsequently terminated? If so, can PRWIC provide a brief summary of the prior process outcome?
Respuesta
Respuesta
04/21/2026 10:07am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
This is a new procurement that has not been published previously.
Pregunta 89
03/20/2026 11:22am - (11889) Intervoice Communication of Puerto Rico, Inc.
RFC-044 Training Logistics Costs Not Included in Price Schedule Line Items [OPERATIONAL] The RFP also does not specify whether PRWIC clinic facilities or government-owned spaces may serve as training venues. Clarification Requested (a) Should venue rental, computer equipment procurement or rental, graphic design, and logistics personnel costs be embedded within the existing D1 and D2.x line items? (b) If embedded, should bidders add a sub-line or note disclosing those component costs? (c) Or should bidders include an additional line item in Schedule #1 for training logistics? (d) May the contractor propose a training delivery model that uses PRWIC clinic facilities or government-owned spaces as training venues in coordination with PRWIC, or must venues be independently contracted in each region? (e) Will PRWIC provide a final headcount per region prior to proposal submission, or must the contractor price training based on the maximum estimate of 500? (f) How should the per-group rollout pricing (line item D2.3.4) be calculated — based on actual headcount per group or a fixed assumed group size?
Respuesta
Respuesta
04/11/2026 07:50pm
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
a) Yes.
b & c) Changes to the Schedule C-proposal costs are not allowed by Bidders. Notes can me added in the Cost Assumptions Section of the Cost Proposal. Training costs must be included under the items:
D2.3-Rollout Central Office Staff
D2.4-Rollout Clinics for each 7 groups of clinics / per group. (Summarize all 7 groups here).
d) Venues must be independently contracted by Bidder for each training.
e) PRWIC recommends contractor to price training based on the maximum estimate of 500.
f) Bidders must use a fixed assumed group size which should be summarized on the Cost Proposal item D2.4.
Pregunta 90
03/20/2026 11:23am - (11889) Intervoice Communication of Puerto Rico, Inc.
RFC-045 No Budget Range or Funding Ceiling Disclosed [OPERATIONAL] RFP Reference Throughout RFP; particularly Section 6 (Contract Period) and Attachment C (Cost Proposal) Basis for RFC The RFP discloses no maximum contract value, funding ceiling, or order-of-magnitude budget reference, which is atypical for a federally funded WIC MIS procurement. The current M&O contract expires September 30, 2027, creating a hard transition deadline. Clarification Requested (a) What is the maximum federal funding available for the D&I phase and the full 5-year contract term? (b) Has PRWIC received FNS approval for the estimated contract value, and if so, at what level? (c) What is PRWIC's plan if proposals received exceed the available funding — will the scope be reduced, or will a re-procurement be initiated? Disclosure of a budget reference is essential for bidders to
Respuesta
Respuesta
04/21/2026 10:11am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
Current regulations do not require the disclosure of a maximum budget or funding ceiling within the RFP.
In accordance with applicable federal regulations, the determination of the estimated contract value and its approval by the Food and Nutrition Service (FNS) constitute an internal administrative matter of the State Agency and shall not be disclosed as part of the procurement process.
Pregunta 91
03/20/2026 11:23am - (11889) Intervoice Communication of Puerto Rico, Inc.
RFC-046 M&O Price Schedules #2 Through #4 Lack Line-Item Structure [OPERATIONAL] RFP Reference Attachment C (Cost Proposal), Pages 95–96; Section 6.3; Section 6.4 Basis for RFC Price Schedules #2 through #4 (Warranty/M&O Years 1–5) are each a single ", the RFP does not address whether monthly rates for optional Year 4–5 M&O extensions are binding upon exercise, or whether the escalation clause in Section 6.4 applies to fixed monthly M&O rates during Years 2–3 and the extension years. Clarification Requested (a) Should bidders include a cost breakdown (labor categories, hours, and rates) behind the monthly fixed price as supporting documentation? (b) What services, functions, and personnel are definitively included in the monthly flat fee, and which are billable as change requests? (c) Will PRWIC issue a minimum M&O service catalog or scope definition that bidders can price against consistently? (d) Should software license fees, third-party platform costs, and recurring technology expenses be included in the fixed monthly M&O price, or itemized separately in the Cost Assumptions section? (e) Are the monthly rates proposed for Years 4–5 binding on the contractor if
Respuesta
Respuesta
04/21/2026 10:13am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
a) No.
b) The Contractor will be responsible for all on-going system operations once the system is completely rolled out island wide. Schedule VI, Section 8.3.4, describes the Change Requests requirements and when it is billable.
c) Please refer to Schedule VI, Sections 8.3.2 & 8.3.3.
d) Yes, should be included in the fixed monthly M&P Price and Yes, it can be itemized in the Cost Assumption Section.
e) The question submitted was incomplete and, therefore, cannot be evaluated or answered as part of this procurement process.
Pregunta 92
03/20/2026 11:24am - (11889) Intervoice Communication of Puerto Rico, Inc.
RFC-048 Schedule — Parallel Operations During Island-Wide Rollout [OPERATIONAL] RFP Reference Schedule VI §8.1.12; §9 Basis for RFC The RFP does not specify whether PRWIC will operate the legacy system (BeWIC/MPSC) in parallel with the new system in already-migrated clinics during the Island-Wide Rollout phase, or whether the rollout plan requires a complete cutover region by region without a parallel operations period. The treatment of contingency reversion costs is also not addressed. Clarification Requested (a) During the Island-Wide Rollout phase, will PRWIC operate the legacy system in parallel with the new system in already-migrated clinics, or does the rollout plan require a complete cutover region by region without a parallel operations period? (b) If a contingency reversion to the legacy system is required for any region, who bears the operational cost of maintaining the legacy environment during rollout?
Respuesta
Respuesta
04/21/2026 10:14am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
The rollout plan require a complete cutover region by region without a parallel operations period with the legacy. The current contractor will have an active contract until the last rollout to the new system is completed.
Pregunta 93
03/20/2026 11:24am - (11889) Intervoice Communication of Puerto Rico, Inc.
(a) Can PRWIC provide an estimated data volume for the current BeWIC system (approximate record counts and database size in GB/TB)? (b) Is there a summary of known data quality issues or prior data cleanup efforts? (c) Will data dictionaries, database schemas, and mapping documentation for the current system be made available to qualified bidders prior to proposal submission, or only to the awarded contractor?
Respuesta
Respuesta
04/22/2026 08:52am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
a) PRWIC and PRDOH OIAT will provide all necessary hardware and software to support the processing of the implemented System.
b) PRWIC does not anticipate data quality issues.
c) Technical data will be provided to the awarded contractor.
Pregunta 94
03/20/2026 11:24am - (11889) Intervoice Communication of Puerto Rico, Inc.
Category K — Security & Compliance RFC-050 Security — FISMA Impact Level Not Specified [TECHNICAL] RFP Reference Schedule VI §8.1.7; §8.1.1 Basis for RFC Security requirements reference FISMA, NIST 800-53, and OWASP. The specific FISMA impact level required for this system (Low, Moderate, or High) is not stated. Specific NIST 800-53 control baselines or additional federal WIC-specific security requirements beyond the standard FISMA framework are also not addressed. Clarification Requested (a) What specific FISMA impact level is required for this system — Low, Moderate, or High? (b) Are there specific NIST 800-53 control baselines or additional federal WIC-specific security requirements beyond the standard FISMA framework that bidders must address in their Security Plans?
Respuesta
Respuesta
04/21/2026 10:16am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
Pregunta 95
03/20/2026 11:24am - (11889) Intervoice Communication of Puerto Rico, Inc.
RFC-051 Security — HIPAA BAA Requirement and Puerto Rico Privacy Law [TECHNICAL] RFP Reference Schedule VI §8.1.1; §8.3 Basis for RFC WIC participant data includes medical and nutritional information for minors. The RFP does not explicitly confirm whether the selected contractor and all subcontractors must execute HIPAA Business Associate Agreements (BAA) as part of the contract, nor does it address additional privacy requirements under Puerto Rico state law applicable to the handling of WIC participant data beyond federal HIPAA obligations. Clarification Requested (a) Must the Selected Contractor and all subcontractors execute HIPAA Business Associate Agreements (BAA) as part of the contract? (b) Are there additional privacy requirements under Puerto Rico law
Respuesta
Respuesta
04/21/2026 03:20pm
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
It is not necessary to sign a BAA, since contracts for this type of service follow the contracting rules in the Department of Health and the standards contained in the applicable federal regulation that includes the Federal HIPAA Act and the CFR (45 CFR Part 160 and Subparts A and E of Part 164).
Pregunta 96
03/20/2026 11:24am - (11889) Intervoice Communication of Puerto Rico, Inc.
RFC-052 Security — Required Independent Audits and Certifications Beyond CSSLP [TECHNICAL] RFP Reference Schedule VI §8.3; §8.1.7 Basis for RFC Beyond the CSSLP certification report required before the Integrated Pilot, the RFP does not specify whether additional independent security audits, penetration tests, or certifications (e.g., SOC 2, FedRAMP, Authority to Operate) are required during the contract period, at what phases these are required, or who bears the associated costs. Clarification Requested (a) Beyond the CSSLP certification, are there required independent security audits, penetration tests, or certifications (e.g., SOC 2, FedRAMP, Authority to Operate) that the contractor must obtain and maintain during the contract period? (b) If so, at what phases are these required? (c) Who bears the cost of these audits and certifications?
Respuesta
Respuesta
04/21/2026 10:17am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
Please refer to Question #11.
Pregunta 97
03/20/2026 11:25am - (11889) Intervoice Communication of Puerto Rico, Inc.
RFC-053 No SLA Penalty Schedule or Uptime Minimums Defined [OPERATIONAL] RFP Reference Section 8.4.3 (Service Levels), Pages 73–74; Schedule VI §8.4.3; §5.3; Attachment A Table 6 Basis for RFC Section 8.4.3 states the SLA will be finalized during contract negotiations and that non-compliance results in payment reductions, but no penalty percentages, uptime minimums, tiered deductions, or grace periods are defined. The requirements matrix references 99.99% availability but this is not confirmed as a contractual SLA target. Clarification Requested (a) What are the minimum system availability/uptime percentages PRWIC expects (e.g., 99.5% or 99.99% during business hours)? (b) What penalty structure is contemplated — fixed deductions, percentage reductions, or tiered schedules? (c) What are the incident response and resolution times by severity tier? (d) What are the help desk performance targets (call answer time, abandonment rate)? (e) Will SLA failures result in financial penalties or service credits? (f) Will PRWIC publish a draft SLA matrix as part of the RFP package so bidders can price performance risk accurately?
Respuesta
Respuesta
04/21/2026 03:25pm
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
a) Please refer to Attachment A, Table #6, functional requirements 3.15.3 & 3.15.4.
b, c, e) The Agency reserves the right to structure penalty mechanisms in accordance with government best practices for procurement and Program operational needs.
d) Please refer to RFP Schedule VI, Section 8.3.3 Help Desk Services.
f) Please refer to RFP Schedule VI, Section 8.4.3-Service Levels. Service levels (SLAs), including availability metrics, response and resolution times, as well as any penalties or credits for non-compliance, will be defined as part of the contractual negotiation with the successful bidder.
Pregunta 98
03/20/2026 11:25am - (11889) Intervoice Communication of Puerto Rico, Inc.
RFC-054 Strategy — PRWIC's Definition of Project Success [STRATEGIC] RFP Reference Schedule VI §4; Section 4.1 Basis for RFC For purposes of evaluating Past Performance and the Technical Proposal, PRWIC has not articulated the 2–3 attributes it considers most critical for a WIC MIS modernization project to be deemed successful. Without this guidance, bidders cannot calibrate their proposals to PRWIC's actual priorities. Clarification Requested Can PRWIC describe the 2–3 attributes it considers most critical for a WIC MIS modernization project to be deemed successful? Specifically, does PRWIC prioritize: (a) speed of implementation with minimal schedule deviation, (b) minimization of operational disruption during transition, (c) post-implementation configurability and staff adoption, or (d) long-term cost efficiency during M&O?
Respuesta
Respuesta
04/11/2026 07:51pm
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
Succesful WIC MIS Modernization project goals are described in Schedule VI, Section 4.
Project Management best practices should be followed for Scope, Time and Cost, Quality, and Resources monitoring and control during the Development and Implementation.
Pregunta 99
03/20/2026 11:25am - (11889) Intervoice Communication of Puerto Rico, Inc.
RFC-055 Strategy — Extension Option Exercise Criteria [STRATEGIC] RFP Reference Section 6.3; Attachment C Basis for RFC The RFP includes optional Year 4 and Year 5 M&O extensions but does not specify the criteria under which PRWIC will make the decision to exercise those options. This affects how bidders price and structure their extended M&O proposals. Clarification Requested (a) Under what criteria will PRWIC make the decision to exercise the optional Year 4 and Year 5 M&O extensions? (b) Will the decision be based exclusively on contractor performance against SLAs, or are there additional factors — budgetary, federal regulatory, or program policy-driven — that will influence that decision?
Respuesta
Respuesta
04/21/2026 10:23am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
Price Schedule #4 refers to years 4 & 5 of the Maintenance and Operations phase, which corresponds to years 6 & 7 including the two (2) years of Development and Implementation.
Years 6 and 7 are optional and are subject to approval by the Financial Oversight and Management Board for Puerto Rico (“Junta de Control Fiscal”).
Pregunta 100
03/20/2026 11:26am - (11889) Intervoice Communication of Puerto Rico, Inc.
RFC-056 Strategy — Development Methodology Preference and Evaluation Impact [STRATEGIC] RFP Reference Schedule VI §8.1.5; Definitions §1.1 Basis for RFC The RFP recommends the Waterfall methodology but states that Agile (RAD) may be proposed as an alternative, subject to discussion with PRWIC. It is unclear whether PRWIC has a stated preference for one methodology over the other, and whether the proposed development methodology will be evaluated as a differentiator under the Technical Proposal scoring. Clarification Requested (a) Does PRWIC have a stated preference for Waterfall or Agile (RAD) methodology? (b) Will the proposed development methodology be evaluated as a differentiator under the Technical Proposal scoring, or is methodology selection neutral in the evaluation?
Respuesta
Respuesta
04/22/2026 08:54am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
a) PRWIC is recommending the traditional waterfall model for system development.
b) Specific evaluation points are assigned by the Evaluation Technical Committee.
Pregunta 101
03/20/2026 11:56am - Enterprise Services Caribe, LLC
Schedule VI – Section 8.1.3(B); Schedule VI Section4; Table 2 - Please confirm acceptable implementation approaches for the PRWIC MIS (new custom build or implementation of an approved FNS modernized system) and whether any approach will be preferred or weighed differently in evaluation.
Respuesta
Respuesta
04/11/2026 07:53pm
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
PRWIC will evaluate proposals based on the responses to PRWIC requirements described in this proposal and Attachment A and Attachment B.
A proposed approach model will not be weighted differently during the evaluation.
Pregunta 102
03/20/2026 11:57am - Enterprise Services Caribe, LLC
Attachment A; Attachment B; Schedule VI - Sections 8.1.2, 8.3.4 - Do Attachments A and B represent the complete set of required enhancements and deviations from FReD 2.0 for the D&I phase, or should vendors anticipate additional discovery-driven customizations beyond these documents?
Respuesta
Respuesta
04/22/2026 08:56am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
The documents included in the RFP, including Attachments A and B, represent the set of functional and technical requirements known to the Agency at the time of issuance of the RFP.
However, considering the nature of technological developments of this magnitude, the Agency recognizes that adjustments may arise during the implementation phase.
Pregunta 103
03/20/2026 11:57am - Enterprise Services Caribe, LLC
Schedule VI – Section 8.1.7 - In lieu of a CSSLP-certified attestation, will PRWIC accept equivalent secure SDLC evidence (e.g., ISO/IEC 27034, NIST SSDF, SOC 2 Type II with SDLC controls), and if so, what minimum artifacts are required?
Respuesta
Respuesta
04/21/2026 10:25am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
Yes, we can accept a SOC 2 Type II with SDLC controls. We do not have a list of required items at this time.
Pregunta 104
03/20/2026 11:57am - Enterprise Services Caribe, LLC
Schedule VI -Section 8.1.7 - Please clarify the required scope of the CSSLP-based certification: MIS application code only, MIS plus integrations/APIs, CI/CD pipelines and IaC, and/or retained external platforms.
Respuesta
Respuesta
04/21/2026 10:26am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
Pregunta 105
03/20/2026 11:58am - Enterprise Services Caribe, LLC
Schedule VI – Sections 3, 8.1.4 - Please specify which source systems, other than MPSC, and data domains that are in scope for conversion to the new MIS and identify the authoritative source for each data set.
Respuesta
Respuesta
04/21/2026 10:27am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
In addition to BeWIC, the external platforms are part of the conversion scope.
Pregunta 106
03/20/2026 11:58am - Enterprise Services Caribe, LLC
RFP – Section 1.5; Section 1.6 - Given the scope and complexity of this procurement, please consider extending the proposal submission deadline by at least four additional weeks.
Respuesta
Respuesta
04/06/2026 09:15am
Orlando Collazo Rivera (Comprador)
Please refer to Amendment No. 1 for the referenced RFP.
Pregunta 107
03/20/2026 11:59am - Enterprise Services Caribe, LLC
RFP – Section 8.3.1 - What hosting options would PR consider for the new WIC MIS (ex. On-prem, Cloud, Hybrid)? If cloud is allowed, does PR have a preferred cloud hosting vendor?
Respuesta
Respuesta
04/21/2026 10:29am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
Please refer to Question #74.
Pregunta 108
03/20/2026 11:59am - Enterprise Services Caribe, LLC
RFP – Section 10 – Bidder Staffing - Please confirm that the Program will provide on-site space for the Contractor’s on-site staff.
Respuesta
Respuesta
04/21/2026 10:30am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
PRWIC does not have the facilities to provide office space for the contractor.
Pregunta 109
03/20/2026 11:59am - Enterprise Services Caribe, LLC
RFP – Section 10 – Bidder Staffing -Would the Program allow key staff to work remotely and travel on-site four times, spending one week on-site during each visit, throughout implementation?
Respuesta
Respuesta
04/21/2026 10:31am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
No. Please refer to Question #41.
Pregunta 110
03/20/2026 11:59am - Enterprise Services Caribe, LLC
Schedule VI – Section 6; Attachment C - Recognizing that this project is subject to USDA‑FNS funding approval and associated cost‑reasonableness considerations, would PRWIC be willing to share an estimated budget range or planning assumption for the Implementation phase and for ongoing Maintenance & Operations?
Respuesta
Respuesta
04/21/2026 10:32am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
Pregunta 111
03/20/2026 12:53pm - CGI Technologies & Solutions Inc.
Please confirm whether the Contractor is expected to operate a participant-facing public call center, or if the scope is limited to MIS application support for clinic and state office users.
Respuesta
Respuesta
04/21/2026 10:33am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
PRWIC requires clarification from in order to properly respond to this question.
Pregunta 112
03/20/2026 12:53pm - CGI Technologies & Solutions Inc.
Can PRWIC provide historical monthly metrics for total help desk tickets by severity level, Tier 1 to Tier 2 escalations, and Severity 1 (critical) incidents?
Respuesta
Respuesta
04/21/2026 10:35am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
The information requested will be provided to the awarded contractor.
Pregunta 113
03/20/2026 12:53pm - CGI Technologies & Solutions Inc.
Are there defined Service Level Agreements (SLAs) for response time, resolution time, system uptime, or first-call resolution? If so, please provide the required metrics.
Respuesta
Respuesta
04/21/2026 03:26pm
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
Please refer to question #97.
Pregunta 114
03/20/2026 12:53pm - CGI Technologies & Solutions Inc.
Is after-hours or 24/7 on-call support required for production incidents?
Respuesta
Respuesta
04/21/2026 10:37am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
Section 8.3.3. Help Desk Services states the following under the bullet Scope of Services, item 5 reads:
"Availability during clinics operation days and hours range from 7:00 am to 9:00 pm and any other time, as required by the Program".
Pregunta 115
03/20/2026 12:53pm - CGI Technologies & Solutions Inc.
Please confirm the current MIS contractor and whether structured knowledge transfer activities will be required during transition.
Respuesta
Respuesta
04/21/2026 10:38am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
Please refer to Question #62.
Pregunta 116
03/20/2026 12:54pm - CGI Technologies & Solutions Inc.
Will the incumbent be contractually obligated to provide documentation, source code, configuration artifacts, and operational procedures?
Respuesta
Respuesta
04/21/2026 10:40am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
Pregunta 117
03/20/2026 12:54pm - CGI Technologies & Solutions Inc.
How many years of historical participant data must be migrated, and can PRWIC provide an estimate of total data volume (GB/TB)?
Respuesta
Respuesta
04/22/2026 03:08pm
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
BeWIC has been in production since October 2022, and all participant data recorded since that date will be required for migration into the new MIS. By the time of the new implementation, this represents approximately 5 years of historical participant data.
Pregunta 118
03/20/2026 12:54pm - CGI Technologies & Solutions Inc.
Are there known data quality issues in the legacy system that should be considered in conversion planning?
Respuesta
Respuesta
04/21/2026 10:42am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
PRWIC does not anticipate any data quality issues at this time that should be considered in conversion planning.
Pregunta 119
03/20/2026 12:54pm - CGI Technologies & Solutions Inc.
What is PRWIC’s expected timeline from contract execution to Pilot go-live?
Respuesta
Respuesta
04/11/2026 07:55pm
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
Schedule VI, Section 9 - Provides a sample Project Schedule for the MIS System Implementation.
Pregunta 120
03/20/2026 12:54pm - CGI Technologies & Solutions Inc.
How many rollout waves are anticipated for island-wide deployment across clinics?
Respuesta
Respuesta
04/11/2026 07:55pm
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
Schedule VI, Section 9 - Provides a sample Project Schedule for the MIS System Implementation.
Pregunta 121
03/20/2026 12:54pm - CGI Technologies & Solutions Inc.
Is the MIS solution expected to be hosted by PRWIC, the Contractor, or within a cloud-based environment?
Respuesta
Respuesta
04/21/2026 10:44am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
Please refer to Question #74.
Pregunta 122
03/20/2026 12:55pm - CGI Technologies & Solutions Inc.
Are specific security frameworks (e.g., NIST 800-53, FedRAMP-equivalent) required? Will third-party security certification or penetration testing be required prior to go-live?
Respuesta
Respuesta
04/21/2026 10:46am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
Please refer to Question #80a.
Pregunta 123
03/20/2026 12:55pm - CGI Technologies & Solutions Inc.
Should pricing clearly separate Development & Implementation costs from ongoing Maintenance & Operations services?
Respuesta
Respuesta
04/21/2026 10:47am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
Yes, they are separated in the Cost Proposal (Attachment C).
Pregunta 124
03/20/2026 12:55pm - CGI Technologies & Solutions Inc.
Can PRWIC confirm whether award will be based on best value methodology or lowest cost technically acceptable?
Respuesta
Respuesta
04/21/2026 10:48am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
Please refer to Section 4.1.5 of this proposal.
Pregunta 125
03/20/2026 01:14pm - (10220) GM Sectec, Corp
44. According to section 8.1.3, pg.58
As part of the system design, a detailed definition of the system architecture and the integration with other state IT systems, platforms and technological components must be included.
Please clarify the concept of 'integration with other states IT systems':
a. Is it for transfers (VOC) or other data?
b. Is there a standard format and some mechanism such as an exchange where donator states submit participant’s VOC data and receiving states retrieve it?
Respuesta
Respuesta
04/11/2026 07:56pm
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
Regarding the following sentence:
"As part of the system design, a detailed definition of the system architecture and the integration with other state IT systems, platforms and technological components must be included."
PRWIC was referring to other PR agencies IT systems. Not other states.
Pregunta 126
03/20/2026 03:25pm - (7908) TRUENORTH CORP
Please confirm whether PRWIC modernization goals (SCHEDULE VI Section 4) are "to develop and implement a modern system that would increase productivity, be user-friendly, configurable, scalable, and tailored to current needs?" If yes, it means that existing MIS solutions or the adaptation of existing MIS solutions already used by the program will not be considered.
Respuesta
Respuesta
04/11/2026 07:57pm
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
PRWIC would accept a COTS/SAM/SaaS, custom development from scratch, or a hybrid approach where some modules are COTS-configured and others are custom-built model as long as the solution includes needs identified in attachment A & B to accomplish the PRWIC Modernization Goals described in Schedule VI, Section 4.
The current MIS solution or adaptation of the current MIS solution is not an option due to many factors identified during PRWIC assessment for publishing this RFP including the understanding that the current system does not complies with the PRWIC goals described in Schedule VI, Section 4.
Pregunta 127
03/20/2026 03:27pm - (7908) TRUENORTH CORP
Are there any improvement or enhancement requests in progress or planned associated with MIS (BeWIC), Data Direct Datawarehouse
WIC Direct, and Vendor WICA Portal, and Vendor Selection that are not described or considered in this RFP? If so, could you share the roadmap for these improvements and a description of what they entail, and the history of the change requests since 2022?
Respuesta
Respuesta
04/21/2026 10:53am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
At this time, there are no significant enhancements in progress or planned for BeWIC and/or the external platforms, other than routine daily corrections or fixes.
PRWIC emphasizes that the contractor will be responsible for developing all requirements specified in this RFP, as well as any additional needs identified during the Analysis and Design sessions.
Pregunta 128
03/20/2026 03:29pm - (7908) TRUENORTH CORP
In terms of the BeWIC's financial functionality, are there other solutions that work or are used outside of the system for reporting, financial consolidation, or for any other purposes, for example, tools or Excel spreadsheets?
Respuesta
Respuesta
04/11/2026 07:58pm
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
Yes, PR WIC uses Excel spreadsheets to supplement the financial reports that are prepared for the federal government.
Pregunta 129
03/20/2026 03:30pm - (7908) TRUENORTH CORP
In terms of the integration with EBT and other interfacing systems identified in the RFP (e.g., Medicaid, Demographic Register, SNAP, TANF), please clarify if PRWIC will be responsible for third-party coordination, schedule dependency management, required interface modifications or integrations, certification support, testing readiness, and any associated cost or schedule impacts for external interfaces?
Respuesta
Respuesta
04/21/2026 10:55am
Maria de los Angeles Díaz Alejandro (Miembro de Comité Evaluador, Usuario Extensión de J.E.D.I.)
PRWIC will be responsible for coordinating with third parties for the activities referenced, including all required interactions with the relevant agencies and contractors.