AVISO DE
SUBASTA INFORMAL
25J-19863
Proyecto para remoción, adquisición e instalación de portones de seguridad con operadores mecánicos para las áreas del Fuel Point, Portón Puente Romero y Portón de los Ranges en el Campamento Santiago en Salinas
Reuniones
Inspección Ocular
Acto de Apertura
Documentos del caso
Invitación
1Invitacion Pliego de subasta 25J-19863.pdf (0.33 MB)
Pliego
1Pliego de subasta 25J-19863.pdf (19.32 MB)
Tabla de Ofertar
1Tabla de ofertar 25J-19863.pdf (0.83 MB)
Documentación adicional
3ambitodetrabajo-25-72 2.pdf (1.16 MB)
clausulasdeinclusion 6.pdf (0.25 MB)
6-29-23ContractClausesRequiredinPurchases 8.pdf (0.14 MB)
Minuta(s)
2minuta_Num_1_Subasta_Informal_25J-19863.pdf (0.27 MB)
Pre-Subasta 25J-19863 - Copy.xlsx (0.01 MB)
Enmiendas(s)
10enmienda_Num_1_Subasta_Informal_25J-19863.pdf (0.44 MB)
TABLA DE COTIZAR Subasta-25J-19863 Enmendada 1.xlsx (0.07 MB)
enmienda_Num_2_Subasta_Informal_25J-19863.pdf (0.45 MB)
enmienda_Num_3_Subasta_Informal_25J-19863.pdf (0.58 MB)
enmienda_Num_4_Subasta_Informal_25J-19863.pdf (0.55 MB)
enmienda_Num_5_Subasta_Informal_25J-19863.pdf (0.54 MB)
TABLA DE COTIZAR Subasta-25J-19863 Enmienda 2.pdf (0.17 MB)
enmienda_Num_6_Subasta_Informal_25J-19863.pdf (0.54 MB)
clausulas de inclusion imperativa.pdf (0.27 MB)
Clausulas federales timbrado 2025.pdf (0.49 MB)
Preguntas y Respuestas
1preguntas_y_respuestas_25J-19863_1.html
Aviso de Resolución
1Aviso Rechazo Global de Ofertas 25J-19863.pdf (0.39 MB)
Preguntas y respuestas
8
Pregunta 1
Respuesta
Pregunta #2:
Si la pregunta va dirigida a que el contratista debe someter algún producto específico, la contestación es que no. Ahora bien, tenemos unos productos de ejemplo que el contratista puede basarse en ellos. Ver documentos adjuntos.
Según Alcance de Trabajo:
Todos los productos utilizados deben ser aprobados antes de la instalación.
Pregunta 2
Respuesta
Pregunta #1:
Según Alcance de Trabajo:
"Sección 1.4"
1.4. Performance of Period
1.4.1. The period of performance is limited to a total of 90 calendar days following the issuance of the Notice to Proceed. This period is divided as follows:
1.4.1.1. 15 Calendar Days: Allocated for submittal approval, documentation, installation access procedures, required training, and other administrative tasks.
1.4.1.2. 60 Calendar Days: Dedicated to executing the scope of the project.
1.4.1.3. 15 Calendar Days: Reserved for final inspections and closing requirements.
Pregunta 3
Respuesta
- •Authorized Personnel Only:
- •18" x 24" or 24" x 36" (Font size: 3-4 inches)
- •Placement: Centered at the top of the gate or prominently displayed.
- •Caution: Automatic Gate:
- •18" x 24" (Font size: 2.5-3 inches)
- •Placement: Directly above or beside the gate operating mechanism, very visible. Consider a bright color background (yellow or orange). A symbol (like a swinging gate with an exclamation point) is highly recommended alongside the text.
- •Entrance:
- •18" x 18" (Font size: 3-4 inches)
- •Placement: Centered on the gate, typically near the hinge side.
- •Exit:
- •Larger: 18" x 18" (Font size: 3-4 inches)
- •Placement: Centered on the gate, typically near the latch/opening side.
- •Material Recommendations:
- •Aluminum: Durable, rust-resistant, lightweight. .063" or .080" thickness is good.
- •Reflective Sheeting: Consider adding reflective sheeting (e.g., Engineer Grade Prismatic) to increase nighttime visibility. Especially important for "Caution: Automatic Gate."
- •UV-Resistant Ink: Essential to prevent fading in sunlight.
- •Rounded Corners: For safety.
Pregunta 4
Respuesta
- •Key/pinpads se localizarán borde de la calle.
Pregunta 5
Respuesta
- •Todos los equipos deben cumplir con el "Buy American Build American Act."
Pregunta 6
Respuesta
Buenos dias!! Se le estará enviando la tabla excel mediante Enmienda #1.
Pregunta 7
Respuesta
Buenos dias!! En el Pliego de ASG, hay que completar en Anejo I y V, los Anejo II y III según corresponda. La Propuesta de la Guardia Nacional tiene su documentación que deben completar como parte de los requisitos.
La respuesta a la pregunta 2 es si, los documentos identificados como “Contract Clauses Required in Purchases de la GNPR y Cláusulas de Inclusión” serán completados y firmados por el representante autorizado del Licitador, así como considerados y presentados por el Licitador en su oferta.
Pregunta 8
Respuesta
- •Los postes deben aguantar vientos sostenidos considerando las condiciones climáticas de CSJTC y la isla de PR.